Math Homework Due in 3 hours
OPRE 315: Homework 2
Please answer the following questions giving all details:
1. The Coat Counters Inc. makes coats and slacks. The two resources required are wool cloth and labor. The company has 200 square yards of wool and 300 hours of labor available. Each coat requires 5 square yards of wool and 10 hours of labor, whereas each pair of slacks requires 6 square yards of wool and 4 hours of labor. The profit for a coat is $15, and the profit for a pair of slacks is $10. The company wants to determine the number of coats and pairs of slacks to make so that profit will be maximized.
a.Formulate a linear programming model for this problem.
b.Solve this model by hand using the Corner Points graphical method.
2. Solve the following linear programming model graphically. In addition, write the problem in standard form and do a constraint analysis for the optimal solution.
Maximize 14x + 20y
Subject to
x + 2y < 20
x + y < 15
x > 8
x, y ≥ 0
3. Copperfield Mining Company owns two mines, each of which produces three grades of ore— high, medium, and low. The company has a contract to supply a smelting company with at least 150 tons of high-grade ore, 120 tons of medium-grade ore, and 150 tons of low-grade ore. Each mine produces a certain amount of each type of ore during each hour that it operates. Mine 1 produces 6.5 tons of high-grade ore, 3.2 tons of medium-grade ore, and 4.8 tons of low grade ore per hour. Mine 2 produces 3.2, 4.0, and 9.8 tons, respectively, of high-, medium-, and low-grade ore per hour. It costs Copperfield $400 per hour to operate mine 1, and it costs $280 per hour to operate mine 2. The company wants to determine the number of hours it needs to operate each mine so that its contractual obligations can be met at the lowest cost.
Formulate a linear programming model for this problem.
Note: Do NOT solve the model after formulating.
4. Determine whether the following linear programming problem is infeasible, unbounded, or has multiple optimal solutions. Draw a graph and explain your conclusion.
Maximize 80x + 60y
Subject to
-3x + 4y < 60
2x + 3y > 60
2x + y > 40
x, y ≥ 0
5. Solve the following linear programming problem.
Max 7x + 6y
Subject to
2x + y > 16
x > 4
y > 5
x, y > 0
11 years ago
15
Purchase the answer to view it

- opre_311.docx
- What percent of 18 is 66
- Art Art Museum
- Finance Help
- Psychology- Discuss the Chinese Room Argument and Evaluate its effectiveness in defeating materialism.
- Unit 2 response 2
- Research Methods two essay questions 250 words or more each (APA style)
- Decision Making Gone Away
- 1. IP is the primary network (layer 3) protocol that contains addressing information and some control information to enable packets...
- Identify five specific ethical issues that 21st century ethical managers must confront. Which of the ethical perspectives described in this chapter seems best suited to resolve such ethical issues? Wh
- Demonstrative Communication Paper need by 12 tonight