Manufacturing-Production Scheduling

profileProjects Easy
 (Not rated)
 (Not rated)
Chat

A company manufactures two products, A and B, on two machines, I and II. It has been determined that the compan will realize a profit of $3/unit on Product A and a profit of $4/unit on Product . To manufacture 1 unit of Product A requires 6 min on Machine I and 5 min on Machine II. to manufacture 1 unit of Product B requires 9 min on Machine I and 4 Min on Machine II. There are 5 hrs of machine time available on Machine I and 3 hrs of machine time available on Machine II in each work shift. How many units of each profuct should be produced in each shift to maximize the company's profit? What is the largest profit the company can realize? Is there any time left unused on the machines?

    • 8 years ago
    Manufacturing-Production Scheduling (Perfect Answer)
    NOT RATED

    Purchase the answer to view it

    blurred-text
    • attachment
      lpp_1.docx