Columbus Foundry, a large manufacturer of heavy equipment components, has determined the following activity cost pools and cost driver levels for the year:

Activity Cost PoolActivity CostActivity Cost Driver
Machine setup$ 600,00012,000setup hours
Material handling120,0002,000tons of materials
Machine operation500,00010,000machine hours


The following data are for the production of single batches of two products, C23 Cams and U2 Shafts:

 C23 CamsU2 Shafts
Units produced500300
Machine hours45
Direct labor hours200400
Direct labor cost$ 5,000$ 10,000
Direct materials cost$ 30,000$ 20,000
Tons of materials12.58
Setup hours37


Determine the unit costs of C23 Cams and U2 Shafts using ABC. 
C23 Cams 
$


U2 Shafts 
$

 

Meridian Company has determined its activity cost pools and cost drivers to be the following:

Cost pools 
Setup$35,000
Material handling6,400
Machine operation240,000
Packing84,000
Total indirect manufacturing costs$365,400

 

Cost drivers 
Setups350
Material moves640
Machine hours20,000
Packing orders1,200

 

One product made by Meridian, metal casements, used the following activities during the period to produce 500 units:

Setups20
Material moves80
Machine hours1,900
Packing orders150

 

(a) Calculate the cost per unit of activity for each activity cost pool.
Setup
$

 


Material move
$

 


Material operation
$

 


Packing
$

 



(b) Calculate the manufacturing overhead cost per metal casement manufactured during the period.
$

 



Assume that manufacturing overhead for Goldratt Company consisted of the following activities and costs:

Setup (1,000 setup hours)$136,000
Production scheduling (400 batches)70,000
Production engineering (60 change orders)60,000
Supervision (2,000 direct labor hours)60,000
Machine maintenance (12,000 machine hours)108,000
Total activity costs$434,000

 

The following additional data were provided for Job 845:

Direct materials costs$7,000
Direct labor cost (5 Milling direct labor hours;
35 Finishing direct labor hours)
$1,000
Setup hours5 hours
Production scheduling1 batch
Machine hours used (25 Milling machine hours;
5 Finishing machine hours)
30 hours
Production engineering3 change orders

 

(a) Calculate the cost per unit of activity driver for each activity cost category.
Setup
$

 


Production scheduling
$

 


Production engineering
$

 


Supervision
$

 


Machine maintenance
$

 



(b) Calculate the cost of Job 845 using ABC to assign the overhead costs.
$

 



(c) Calculate the cost of Job 845 using the plantwide overhead rate based on machine hours.
$

 

 

 

 

 

 

    • 11 years ago
    • 15
    Answer(1)

    Purchase the answer to view it

    blurred-text
    NOT RATED
    • attachment
      managerial_accounting.xlsx