M1 A3 Assignment 3: Defining the Project Scope
Assignment 3: Defining the Project Scope Review the project case. Determine the scope of the District 4 Production Warehouse Move project from the information provided in the case. Using the Project Scope Checklist, prepare a scope document for review and approval by the project sponsor prior to starting the project. Project Scope Checklist
Submit your report to M1: Assignment 3 Dropbox by Wednesday, November 27, 2013.
PROJECT OBJECTIVE To construct a high-quality, custom home within five months at cost not to exceed $350,000. DELIVERABLES • A 2,200-square-foot, 2½-bath, 3-bedroom, finished home. • A finished garage, insulated and sheetrocked. • Kitchen appliances to include range, oven, microwave, and dishwasher. • High-efficiency gas furnace with programmable thermostat. MILESTONES 1. Permits approved—March 5 2. Foundation poured—March 14 3. Drywall in. Framing, sheathing, plumbing, electrical, and mechanical inspections passed—May 25 4. Final inspection—June 7 TECHNICAL REQUIREMENTS Page 1. Home must meet local building codes. 2. All windows and doors must pass NFRC class 40 energy ratings. 3. Exterior wall insulation must meet an “R” factor of 21. 4. Ceiling insulation must meet an “R” factor of 38. 5. Floor insulation must meet an “R” factor of 25. 6. Garage will accommodate two large-size cars and one 20-foot Winnebago. 7. Structure must pass seismic stability codes. LIMITS AND EXCLUSIONS
1. The home will be built to the specifications and design of the original blue |
13 years ago
20
Purchase the answer to view it

- defining_the_project_scope_of_the_district_4_production_warehouse_move_project.doc
Purchase the answer to view it

- defining_the_project_scope.docx
Purchase the answer to view it

- mgt_402_module_1_assignment_3_defining_the_project_scope.doc
Purchase the answer to view it

- mgt_402_unit_1_module_1_assignment_3_defining_the_project_scope_answer.docx
Purchase the answer to view it

- mgt_402_unit_1_module_1_assignment_3_defining_the_project_scope_answer.docx
Purchase the answer to view it

- mgt_402_unit_1_module_1_assignment_3_defining_the_project_scope_answer.docx
Purchase the answer to view it

- project-scope__final.docx
- Scanner Project Analysis
- 27. Inorganic substances become what in water?
- CORPORATE FINANCE HOMEWORK
- economics figures
- I need help with a spanish two assignment ASAP- will pay!
- 1
- Please help me?
- a bag contains 40 balls . 12 of the balls are red , 11 of them are blue , 9 are...
- Suppose that citizens fear electricity shortages in the near future. Could we see a run on electricity that leads to...
- Evaluate 9.2 Problem 24