Linear Programming

profileor103b

A manufacturing company produces four different models of integrated circuits. Each type of circuit requires material, labor, and machine time. The optimal combination of the four types of circuits is limited by the constraints of availability for these three resources. The formulation of the linear programming production problem is:

Maximize Z = 12x1 + 10x2 + 15x3 + 11x4 (objective function for profit)

 

Subject to the following constraints:

Material:5x1 + 3x2 + 4x3 + 2x4 <= 240 pounds
Machine time:6x1 + 8x2 + 2x3 + 3x4 <= 240 hours
Labor:2x1 + 3x2 + 3x3 + 2x<= 180 hours

Nonnegativity: x1, x2, x3, x4 >= 0

Where: x1 = quantity of Product 1 produced

           x2 = quantity of Product 2 produced

           x3 = quantity of Product 3 produced

           x4 = quantity of Product 4 produced

 

Use Microsoft Excel and Solver to find the optimal solution for the production problem. Be sure that values selected by the computer are integers (as it doesn't make any sense to discuss producing part of a unit of a product).

Include your interpretation of the results by stating:

  • How many of each product will be produced?
  • What is the profit for the optimal solution?
  • What resource(s) is limiting the production?

Submit the solution for the production problem in a Microsoft Excel worksheet with proper labeling for columns and all required calculations. Submit your interpretations in a 1- to 2-page Microsoft Word document.  Support your responses with examples.  Needs to be plagiarism free and have in-text citations and full reference list

.

Assignment 2 Grading Criteria
Maximum Points
Correctly implemented this problem in Microsoft Excel using the Solver add-in.
60
Determined how many units of each product would be produced.
45
Determined the profit for the optimal allocation of resources.
35
Discussed the resource(s) that is limiting the system from producing even more units of product (and, thereby, earning more profit).
50
Written components.
10
Total:
200

 

    • 12 years ago
    • 5
    Answer(2)

    Purchase the answer to view it

    blurred-text
    NOT RATED
    • attachment
      lotech_manufacturing_linear_programming_production_problem_lpp.xls

    Purchase the answer to view it

    blurred-text
    NOT RATED
    • attachment
      mgt4059_week_3_assignment_2_problems.zip
    Bids(0)
    other Questions(10)