Figure 16.40 illustrates the BOM for product A. The MPS start row in the master production schedule for product A calls for 50 units in week 2, 65 units in week 5, and 80 units in week 8. Item C is produced to make A and to meet the forecasted demand for replacement parts. Past replacement part demand has been 20 units per week (add 20 units to C’s gross requirements). The lead times for items F and C are 1 week, and for the other items the lead time is 2 weeks. No safety stock is required for items B, C, D, E, and F. The L4L lot-sizing rule is used for items B and F; the POQ lot-sizing rule (P = 3) is used for C. Item E has an FOQ of 600 units, and D has an FOQ of 250 units. On-hand inventories are 50 units of B, 50 units of C, 120 units of D, 70 units of E, and 250 units of F. Item B has a scheduled receipt of 50 units in week 2. Develop a material requirements plan for the next 8 weeks for items B, C, D, E, and F.
13 years ago
10
Answer(0)
Bids(0)
other Questions(10)
- How do i simplify radical 240 x to the third power and y to the 2nd power?
- The yearly production of a 6 foot orange tree is 40 pounds of oranges. A 16 foot tree produces 65...
- The 2nd Amendment protects the right to keep and bear arms. How would you handle this? Allow anyone to have...
- Econ
- what is a Martyr
- why is chocolate good for you
- John filled two cylindrical jars with jelly. The first cylinder was 16 cm tall and 8 cm wide. ...
- If you randomly pick a date in April,how many equally likely outcomes are there?
- FIND THE UNKNOWN LENGTH
- What is perception, and what factors influence our perception?