design
Final Project
Students will author a complete final interactive project, employing ActionScript within Flash Professional.
When creating the project, the student will:
● Demonstrate proper utilization of basic, intermediate, and advanced ActionScript techniques within the interactive project.
● Integrate principles of graphic design.
● Integrate principles of user-interface design.
● Integrate rich interactivity into the final project.
Requirements:
● Your final interactive project must be done using Adobe Flash Professional and utilize ActionScript 3.0. Projects must be uploaded to Blackboard with both the .SWF and .FLA files (embedding into a website is optional).
Interactivity:
● Your final interactive project must be fully interactive, i.e., elements on the stage that the user can click, move, etc. Also, different screens are present (e.g, game over scene, different web site page, etc.)
The project will be graded using the following rubric:
CATEGORY | 4 | 3 | 2 | 1 |
Attractiveness | Makes excellent use of font, color, graphics, effects, etc. to enhance the presentation. | Makes good use of font, color, graphics, effects, etc. to enhance to presentation. | Makes use of font, color, graphics, effects, etc. but occasionally these detract from the presentation content. | Use of font, color, graphics, effects etc. but these often distract from the presentaion content. |
Requirements | All requirements are met and exceeded. | All requirements are met. | One requirement was not completely met. | More than one requirement was not completely met. |
Interactivity | All requirements are met and exceeded. | All requirements are met. | 2 or fewer interactive elements present. | The project does not present any interactive elements |
ActionScript | Project utilizes advanced usage of ActionScript | Project utilizes intermediate level of ActionScrict including: Event Listeners, variables, functions, etc. | Project contains basic use of ActionScript and/or Behaviors. | The project does not contain any ActionScript or use of Behaviors. |
Functionality | Project displays complete functionality and is executed flawlessly. | Project functions properly with no errors. | Project functions, but there are some portions that do not work properly. | Project does not function properly, ActionScript errors are present throughout. |
9 years ago
5
- What is the prepositional phrase in the following sentence Marths left for home after she had gone to church and to...
- HSM 340 Week 2 Quiz
- ACTIVITY BASED COSTING and SEGMENT PROFITABILITY ANALYSIS_Happy Chips Inc
- Operations Management
- PROJ 592 Week 1 Assignment; YouDecide.........................(PROJ 592 Project Cost and Schedule Control - DeVry)
- Valley Corporation purchased a new piece of equipment on June 1, 2011. The cost of this machine was $325,000. The company estimated that the machine would have a salvage value of $25,000 at the end of its service life. Its life is estimated at four years
- 5 page paper will pay $5 can u do it?
- accountguru
- Kiddos To 4th Baby
- polynomial function that passes through these points: (-14,14), (-10,0), (0,-1), (8,0), (12,4) plese help me, Im helpless