Controlling Risk

profilemrgblaesrqel
  • Section 5: Controlling Risk
    • This final section combines all of the previous sections and gives the opportunity to look at mechanisms to control risk.

Be sure to include an abstract and a References page in your final draft.

The project deliverables for Week 5 are as follows:

  • Section 5: Controlling Risk
    • Given the following categories or areas where risk exists, and then the 3 assets for each, describe how you will test for associated risk:
      • Administrative
        • Human resources: Hiring and termination practices
        • Organizational structure: A formal security program
        • Security policies: Accurate, updated, and known or used
      • Technical
        • Access control: Least privileged
        • System architecture: Separated network segments
        • System configurations: Default configurations
      • Physical
        • Heating and air conditioning: Proper cooling and humidity
        • Fire: Fire suppression
        • Flood: Data center location
    • Once you have described the tests that will be conducted to test each, assume that failure or holes were found in each of them.
    • Next, describe at least 3 safeguards for each that could be put in place to address the risk.
  • Name the document "yourname_IT454_Final.doc."
  • 10 years ago
  • 3
Answer(0)