BSOP 429 Full Week 4...............(BSOP 429 Production Activity Control & Just-in-Time with Lab - DeVry)
(Not rated)
(Not rated)
BSOP 429 Week 4 Written Assignment
BSOP 429 Week 4 Lab 3 of 6; Scheduling, Reporting and Feedback
BSOP 429 Week 4 Discussion 1 PAC Feedback (graded)
BSOP 429 Week 4 Discussion 2 Lab 3 Discussion (graded)
BSOP 429 Week 4 Midterm Exam (2 Set)
BSOP 429 Week 4 Midterm Exam - Set 1
- Page 1
2. (TCO 2) Which of the following lead-time elements can be compressed into one well-designed PAC system? (Points : 5)
3. (TCO 3) What happens to inventory as the number of kanban cards increases? (Points : 5)
4. (TCO 1) In managing supplier relations, which of the following is a beneficial setup? (Points : 5)
5. (TCO 6) When linking marketing requirements and manufacturing strategy, what design approaches for shop floor system should be considered? (Points : 5)
6. (TCO 9) Which of the following is true? (Points : 5)
7. (TCO 4) According to Elyahu Goldratt, the TOC system uses a scheduling approach called _____. (Points : 5)
8. (TCO 5) The amount of time covered by the basic MRP record is called the _____. (Points : 5)
- Page 2
2. (TCO 2) How does input from other areas into PAC and the feedback PAC provides impact PAC? Explain. (Points : 20)
3. (TCO 6) Discuss the differences between MRP and JIT. (Points : 20)
BSOP 429 Week 4 Midterm Exam - Set 2
- Multiple Choice
2. (TCO 2) An operation setback chart _____.
3. (TCO 3) In order to minimize the number of orders waiting in the queue and maximize the number of orders processed in a center, which of the following rules should be used?
4. (TCO 1) Which of the following is true?
5. (TCO 6) When linking marketing requirements and manufacturing strategy, what design approaches for shop floor system should be considered?
6. (TCO 9) Which of the following is true?
7. (TCO 4) How much of total lead time is accounted for by queue time?
8. (TCO 5) Gross requirements in an MRP record are _____ because they are stated as unique items for a given period.
- Essay Type
2. (TCO 2) What information should be provided into PAC as feedback and why they are important?
3. (TCO 6) Compare and contrast JIT and MRP.