MBA 7608 – Project Planning, Monitoring & Control

 

Assignment 2 – Scheduling and Networks

 

 

You have developed the Scope Statement and WBS breakdown for the city Green Space project. You are now tasked with developing a network diagram that will show the overall duration of the project.

 

Assume that the attached is the WBS that you developed for the project. Also attached are the definitions of the level 3 WBS activities and the expected durations for each activity.

 

1)      Develop a network diagram for the project. Identify the critical path for the project. What is the overall project duration in weeks?

 

2)      Assume you have presented the above diagram and project duration to the client. The client has asked you to reduce the schedule by 2 weeks. How can you manipulate your schedule to achieve this reduction? You may not reduce the durations of the activities.

 

Note: For the purposes of this exercise ignore the WBS activity ‘Design, Project Management and Control’.

 

 

WBS

Definition

Expected Duration

1.2.1 Hazardous Waste

Remove hazardous waste (eg oil, batteries) from site

3 weeks

1.2.2 Garbage Removal

Remove all garbage type waste from site

1 week

1.2.3 Other waste (eg concrete)

Remove other waste such as concrete and building rubble from site

2 weeks

1.3.1 Grading

Perform overall grading for site to obtain required site profile and drainage

3 weeks

1.3.2 Make Beds

Build and prepare flower beds

2 weeks

1.4.1 Install Playground

Install playground

3 weeks

1.4.2 Place Borders & Gravel

Place border around playground and spread gravel under playground

1 week

1.5.1 Brick pathways

Build brick pathways through green space

3 weeks

1.5.2 Signage

Install required signage throughout green space

1 week

1.5.3 Fencing

Install fencing around green space including required gates

2 weeks

1.6.1 Lay Grass

Lay grass using pieces of sod

2 weeks

1.6.2 Plant Trees

Plan trees throughout green space

1 week

1.6.3 Plant Shrubs

Plan shrubs in beds

1 week

1.6.4 Plant Flowers

Plant flowers in beds

1 week

 

 