A+ Answers of the following Questions
1. (TCO 5) This is a customizable value used to influence which switch becomes root. (Points : 5)
Bridge priority
Bridge protocol data unit
Designated ports
Disabled state
2. (TCO 5) Which contains a priority value and the MAC address? (Points : 5)
Bridge priority
Bridge protocol data unit
Designated ports
Bridge ID
3. (TCO 6) Which option is not a valid inter-VLAN routing method? (Points : 5)
Spanning-tree routing
Router-on-a-stick
Multilayer-switch-based routing
1. (TCO 6) In order to provide inter-VLAN routing between the router and the switch, a _____. (Points : 5)
trunk will need to be set up
trunk will not need to be set up
trunk is optional
none of the above
2. (TCO 6) A trunk port carries traffic for multiple VLANs using Inter-Switch Link (ISL) encapsulation or _____ tagging. (Points : 5)
802.1Q
801.2Q
801.1Q
none of the above
3. (TCO 5) The length of time that a port saves BPDU information is called _____. (Points : 5)
listening state
maximum age
nondesignated ports
PortFast
1. (TCO 3) Please list two trunking modes and describe when either trunking mode is used. (Points : 24)
2. (TCO 4) Explain the process of VTP pruning. (Points : 24)
3. (TCO 5) Explain the purpose of Spanning Tree Protocol (STP). (Points : 24)
1. (TCO 6) Explain traditional inter-VLAN routing. (Points : 24)
2. (TCO 7) Explain what BSS and ESS are, as well as the difference between the two. (Points : 24)
3. (TCO 4) Explain the process of VTP pruning. (Points : 24)
1. (TCO 4) What is the command that verifies that Frame Relay is running correctly? (Points : 3)
show interfaces
encapsulation frame-relay
show frame-relay map
debug frame-relay
2. (TCO 4) Local Management Interface (LMI) is a keep-alive mechanism that provides status information about Frame Relay connections between the _____ and the Frame Relay _____. (Points : 3)
beginning, end
switch (DCE), router (DTE)
router (DTE), switch (DCE)
router (DCE), switch (DTE)
3. (TCO 4) The reason that more companies implement partial-mesh topologies instead of full mesh is because (Points : 3)
it requires too much cabling.
of the cost of number of lines required.
it requires too much equipment.
it is not manageable.
12 years ago
Purchase the answer to view it

- 1solutions.doc