ACCT 212 Full Course Project 1: Rawls Repair Corporation + Course Project 2: McDonough Products

profileGuide4Students
 (Not rated)
 (Not rated)
Chat

ACCT 212 Financial Accounting - DeVry

Course Project 1 consists of two parts, A and B, respectively. There are 10 requirements for you to complete in this exercise, Part A has 1-3 and Part B has 4-10. Part A is due at the end of Week 3. Part B is due at the end of Week 5. 
ACCT 212 Week 3 Course Project 1 Part A: Rawls Repair Corporation
1. Download the Excel template named ACCT212_CourseProject1 located on the Doc Sharing tab in the course shell.
2. To complete Part A (due at the end of Week 3):

  • Complete Requirements 1-3 on the Journal Entries, General Ledger, and Trial Balance worksheets.
  • Type your work directly into the worksheets.
  • Save your workbook as "CourseProject1A_ ACCT212_YourLastName".
  • Submit your workbook to the Dropbox under "Course Project 1-Part A" by the end of Week 3. Submit your assignment to the Dropbox located on the silver tab at the top of this page.
ACCT 212 Week 5 Course Project 1 Part B: Rawls Repair Corporation

3. To complete Part B (due at the end of Week 5):

  • Using feedback from your instructor and the worksheets from Part A, complete requirements 4-10.
  • Type your work directly into the worksheets.
  • Save your workbook as "CourseProject1B_ACCT212_YourLastName".
  • Submit the workbook to the Dropbox under "Course Project 1-Part B" by the end of Week 5. Submit your assignment to the Dropbox located on the silver tab at the top of this page.

ACCT 212 Week 7 Course Project 2 McDonough Products
Course Project 2 consists of Problem 13-52A from your textbook. At the end of Course Project 2, you will be able to prepare common-size statements, analyze profitability; and make comparisons with the industry. Course Project 2 is due at the end of Week 7.
1. Download the Excel template named ACCT212_CourseProject2 located on the Doc Sharing tab in the course shell.
2. To complete Course Project 2 (due at the end of Week 7):

  • Using the requirements worksheet for reference, complete requirements 1-3 on the Your Solution worksheet.
  • Type your work directly into the worksheet.
  • Save your workbook as "CourseProject2_ACCT212_YourLastName".
    • 11 years ago
    ACCT 212 Full Course Project 1: Rawls Repair Corporation + Course Project 2: McDonough Products
    NOT RATED

    Purchase the answer to view it

    blurred-text
    • attachment
      acct_212_full_course_project.zip