The Gilster Company, a machine tooling firm, has several plants. One plant, located in St. Falls, Minnesota, uses a job order costing system for its batch production processes. The St. Falls plant has two departments through which most jobs pass. Plantwide overhead, which includes the plant manager%u2019s salary, accounting personnel, cafeteria, and human resources, is budgeted at $300,000. During the past year, actual plantwide overhead was $284,000. Each department%u2019s overhead consists primarily of depreciation and other machine-related expenses. Selected budgeted and actual data from the St. Falls plant for the past year are as follows:

 

 Department ADepartment B
Budgeted department overhead      
(excludes plantwide overhead)$141,100 $616,000 
Actual department overhead 162,000  636,000 
Expected activity:      
Direct labor hours 32,000  20,000 
Machine-hours 17,000  44,000 
Actual activity:      
Direct labor hours 33,500  19,400 
Machine-hours 17,800  46,000 

 

For the coming year, the accountants at St. Falls are in the process of helping the sales force create bids for several jobs. Projected data pertaining to job no. 110 are as follows:

 

 
Direct materials$23,500 
Direct labor cost:   
Department A (2,600 hr) 39,000 
Department B (1,500 hr) 11,600 
Machine-hours projected:   
Department A 140 
Department B 1,200 
Units produced 8,000 

eBook Links (6)references

Section BreakComprehensive Problem 5 



Comprehensive Problem 5 Part a

a.1

Assume the St. Falls plant uses a single plantwide overhead rate to assign all overhead (plantwide and department) costs to jobs. Find the overhead rate by using expected direct labor hours. (Round your answer to 2 decimal places. Omit the "$" sign in your response.)

 

Overhead rate$ per direct labor hour

 

a.2

Determine the projected amount of total manufacturing costs per unit for the units in job no. 110. (Round your answer to 2 decimal places. Omit the "$" sign in your response.)

 

Manufacturing costs for Job 110$ per unit

check my workreferences

WorksheetComprehensive Problem 5 Part aDifficulty: Hard



2. value:
25.00 points

Comprehensive Problem 5 Part b

b.1

Calculate plantwide overhead rate using Machine Hours on projected manufacturing costs for job no. 110.(Round your answer to 2 decimal places. Omit the "$" sign in your response.)

 

Plantwide overhead rate$ per machine hour

 

b.2

Calculate two separate department overhead rates using Machine Hours on projected manufacturing costs for job no. 110. (Round your answers to 1 decimal place.Omit the "$" sign in your response.)

 

 
Overhead rate%u2014Department A$ per machine hour
Overhead rate%u2014Department B$ per machine hour

 

b.3

Recalculate the projected manufacturing costs for job no. 110 using three separate rates: one rate for plantwide overhead and two separate department overhead rates, all based on machine-hours. (Round your intermediate calculations and final answer to 2 decimal places. Omit the "$" sign in your response.)

 

Total cost$ per unit

check my workreferences

WorksheetComprehensive Problem 5 Part bDifficulty: Hard



3. value:
25.00 points

Comprehensive Problem 5 Part c

c.1

The sales policy at St. Falls dictates that job bids be calculated by adding 27 percent to total manufacturing costs. What would be the bid for job no. 110 using the overhead rate from part a ? (Round your intermediate calculations to 2 decimal places and final answer to the nearest dollar amount. Omit the "$" sign in your response.)

 

Bid price$

 

c.2

The sales policy at St. Falls dictates that job bids be calculated by adding 27 percent to total manufacturing costs. What would be the bid for job no. 110 using the overhead rate from part b ? (Round your intermediate calculations to 2 decimal places and final answer to the nearest dollar amount. Omit the "$" sign in your response.)

 

Bid price$

 

c.3Which of the overhead allocation methods would you recommend ?
  
 
 Overhead rate by direct labor hours
 Overhead rate by machine Hours

check my workreferences

WorksheetComprehensive Problem 5 Part cDifficulty: Hard



4. value:
25.00 points

Comprehensive Problem 5 Part d

d.

Using the allocation rates in part b, compute the under- or overapplied overhead for the St. Falls plant for the year. (Round your intermediate calculations to 2 decimal places and final answer to the nearest dollar amount. Omit the "$" sign in your response.)

 

(Click to select) Underapplied Overapplied$

check my workreferences

WorksheetComprehensive Problem 5 Part dDifficulty: Hard



5. value:
10.00 points

Comprehensive Problem 5 Part e

e.

A St. Falls subcontractor has offered to produce the parts for job no. 110 for a price of $13 per unit. Assume the St. Falls sales force has already committed to the bid price based on the calculations in part b. Should St. Falls buy the $13 per unit part from the subcontractor or continue to make the parts for job no. 110 itself?

 Subcontractor
 Continue to make the part

check my workreferences

Multiple ChoiceComprehensive Problem 5 Part eDifficulty: Hard


6. value:
15.00 points

Comprehensive Problem 5 Part f

f.

Would your response to part e change if the St. Falls plant could use the facilities necessary to produce parts for job no. 110 for another job that could earn an incremental profit of $27,000?