Work breakdown structure

extaga

 Create a high-level WBS comprised of at least three levels: 

 • Each level should have with a minimum of five level 1 tasks, with two level 2 tasks, and three (3) Level 3 tasks. • Describe each task (work package) in your WBS with just enough information so that everyone in the team can understand what each work package means. • Level Numbering: o Your first level of tasks should be numbered 1.0, 2.0, 3.0, 4.0, and 5.0. o Your second level of tasks should be numbered 1.1, 1.2, 2.1, 2.2, etc., o The third level of tasks should be numbered 1.1.1, 1.1.2, 1.  1.1.3, 1.2.1, 1.2.2. 1.2.3 etc.  

 Submit a Word document. • There is no need to use APA formatting for this assignment 

  • 5 years ago
  • 20
Answer(1)

Purchase the answer to view it

  • order_161555_445243.doc