Wk 2 - Apply: Summative Assessment: Statistical Process Control Methods

gbensmilling


  1. This assignmnet has a grading rubric


    To learn how to apply Statistical Process Control Methods (SPCM) to a process, continue the flowchart from Week 1 and identify variances within a process. You can find variances from the data identified in Week 1.

    Complete the Week 2 Statistical Process Control Methods Worksheet.


    To begin, measure the entire process over 10-12 periods of time (days, months, years). Use time as your Metric.
    Create a control chart including the baseline, upper control limits (UCL) and lower control limits (LCL). 


    Submit your assignment using the Week 2 Statistical Process Control Methods Worksheet.
    You may include your computations and graphs on the work sheet, or attach them separately.


     Use subject line of:
    Student Name, Assignment week, date due
    Example
    Michael Lindquist, Week 2, 5.23.2023
  • 3 years ago
  • 10