In this assignment, you will identify how you will incorporate quality in the project you

selected in Unit 2.

Instructions:

• Explain in detail how will you plan, manage, and control quality in your project.

Requirements:

• APA formatted Word coument.

• At least 3 pages excluding title and reference pages.

Be sure to read the criteria by which your work will be evaluated before you write

and again after you write.

BUS530 – Project Managment

Planning for Quality

Evaluation Rubric for Planning for Quality Assignment

Criteria Exemplary Proficient Needs

Improvement Deficient

65 points 52 - 64 points 39 - 51 points 0 - 38 points

Quality Components

Planning, managing and controlling quality components addressed in full detail.

Planning, managing and controlling quality addressed; missing some detail(s).

Most required components of planning, managing and controlling quality are addressed.

Some or no components of planning, managing and controlling quality are addressed.

10 points

0 points

Length At least 3 pages long.

n/a n/a Less than 3 pages long.

25 points 20 - 24 points 15 - 19 points 0 - 14 points

Clear and Professional Writing and APA Format

Writing and format are clear, professional, APA compliant and error free.

Few errors that do not impede professional presentation.

Significant errors that do not impede professional presentation.

Errors impede professional presentation; guidelines not followed.

ProjectManagementTermsandConcepts.pdf

Running head: PROJECT MANAGEMENT TERMS AND CONCEPTS 1

Project Management Terms and Concepts

Symeshia Lias

Post University

BUS530_32_Project Management

January 21, 2024

Date

PROJECT MANAGEMENT TERMS AND CONCEPTS 2

Project Management Terms and Concepts

Overview of Selected Project

The selected article for this document is by Zolotukhin et al. (2020), which addresses an

architect's procedures in handling a house's development. The authors discussed a suitable

proposal for building individual and economical residential buildings in the article, specifically

in suburban and rural areas. A productive method of handling the project was implemented when

it addressed the building of the houses using materials, structural drawings, and reusing materials

so that there would be reliable low-rise buildings constructed in the proposed areas. The article

discussed how building structures would be created using recycled items from areas that had

been demolished. Handling a construction process using items from demolished buildings proved

itself to be a feasible construction process (Zolotukhin et al., 2020). Different images of floor

plans and actual construction processes were included in the article to strengthen understanding

of the project’s performance.

Qualification as a Project

The selected article qualifies as a project because it details different efforts implemented

in developing buildings using materials from other demolished buildings. The article is a project

because it proposes using recycled materials to construct buildings and then initially explains

theoretical concepts about low-rise residential buildings. An explanation of the significance of

the construction process was performed in the article, which explained how a particular floor

plan, the cost of engineering equipment, the heat loss of proposed buildings, and the wall volume

were all required to facilitate the planning of the proposed project. There was discussion of the

partitioning process of the building whereby the proposed floor plan would include a garage,

study, bedroom, parlor, kitchen, living room, cold annex, sauna, workshop, boiler room, entrance

PROJECT MANAGEMENT TERMS AND CONCEPTS 3

hall, sitting room, bathroom unit, and corridor (Zolotukhin et al., 2020). All the details shared

illustrate how the building construction would be performed appropriately.

Project Objectives

The project's primary objective was to design and construct residential buildings that

would align with the need to develop residential buildings. Aligning with local regulations,

building requirements, and the client's vision are other objectives guiding the project's direction.

Another objective is to explain the processes for constructing a house that would economically

benefit two families. Improvement of the project’s performance was another objective by

facilitating the implementation of the low-rise buildings using low-cost materials. Achieving the

objectives would be possible using the project's direction of demolishing houses constructed in

the 1960s-70s. Handling all the objectives was possible by appropriately managing construction

plans and generating adequate resource access.

Project Manager’s Role

For the construction of low-rise buildings, the project manager’s role initially is to liaise

with the Ministry of Regional Development of Russia to present the proposal in a way that

supports construction. The project manager will ensure that different project components are

adequately implemented in a way that communicates an architect's vision using pictures of the

floor plans. Using the proposed drawings, the project manager is responsible for ensuring all

directions by the architects and contractors get implemented in a way that facilitates adherence to

initial project directives. Implementation of careful planning, budget development, resource

allocation, and communication of project operations are all project manager duties. Developing a

well-explained direction is imperative for the project manager whose experience and direction

are needed to ensure communication of all expected tasks get performed suitably.

PROJECT MANAGEMENT TERMS AND CONCEPTS 4

More roles of the project manager include coordinating team members' roles so that they

appropriately implement expected activities. The team members include designers, architects,

contractors, and engineers who have unique professional experience that is needed to ensure

better performance of the construction process. It would then be possible to ensure the project

gets operated on within an initially defined scope and any unforeseeable outcomes can be

managed using risk management. The project manager can further handle daily performance

once the project gets implemented by identifying potential challenges for the entire project using

feedback mechanisms (Balmer et al., 2020). Using researched information, it would be possible

to devise strategies for mitigating any risk that would reduce proper project momentum. Further,

the project sponsor can liaise with the project sponsor to address the decision-making procedures

needed to develop the entire project feasibly.

Project Sponsor’s Role

The role of a project sponsor is to represent the client and then communicate all their

expected actions. Addressing the entire project will be performed suitably after addressing

different resources for the proposed buildings and ensuring all materials requisition activities get

handled in the expected way. The sponsor can offer support throughout a project's lifecycle in its

planning stage, development, and all actions up to completion. It is then possible to establish

project priorities to facilitate organizational development, design assessment, and change work

procedures depending on the client’s initial expectations.

Project Scope

The scope of the low-rise residential building construction involves the demolishing of

old buildings, using materials from demolished buildings as recycled items for proposed

construction, working with the government ministry for better performance, and purchasing

PROJECT MANAGEMENT TERMS AND CONCEPTS 5

resources to adhere to the total amount for the project, being 143,322.8 euros. Implementation of

the project would be performed reliably when all project operations are implemented in a

constructive manner that is developed to ascertain all activities and then connect them to existing

resources.

Project Team Member’s Role

It is imperative for all project team members, who are engineers, designers, contractors,

and architects, to be in charge of the whole design. Developing a collaborative team would be a

feasible process that ensures all team members understand their roles in a way that adheres to

expected project performance (Abramov & AlZaidi, 2023). An imperative method is to address

the project's scope while creating a design process that ascertains operational efficiencies

suitably. A residential building's full development requires structural integrity that cohesively

addresses functional elements, aesthetic quality of the building, and communicating unique

operational efficiencies for the project.

Project Risk/Uncertainty

The project has inherent risks regarding adherence to local building regulations, budget

and timeline changes, and assigning roles to different persons. Addressing uncertainties is crucial

for ensuring all work operations are performed feasibly. TrainingThe use and development

procedures are a productive method of ensuring any forms of performance get handled in a way

that addresses the proposed project of building low-rise buildings.

Project Outcomes

The project's outcome shall be the successful use of recycled materials from old

buildings, facilitating the proper development of new structures without wasting money on new

materials. Use of the proposed floor plan shall also ensure that the persons involved in the

PROJECT MANAGEMENT TERMS AND CONCEPTS 6

project manage construction activities in a way that signifies project success. All the architectural

plans and construction projects would be performed in a feasible method that envisions different

activities for securing the project's scope.

Lesson Learned

A review of the project, as explained in the article, reveals that the proposed building

would be constructed properly to address all expectations of the floor plan. Using detailed

guidelines for any project is feasible for feasibly implementing construction activities,

communicating, and addressing unique challenges that might progress while the project gets

implemented.

PROJECT MANAGEMENT TERMS AND CONCEPTS 7

References

Abramov, I., & AlZaidi, Z. A. (2023). Evaluation of the Effective Functioning of Construction

Enterprises in the Conditions of Occurrence of Diverse Risk Factors. Buildings, 13(4), 995.

https://doi.org/10.3390/buildings13040995

Balmer, D. F., Riddle, J. M., & Simpson, D. (2020). Program Evaluation: Getting Started and

Standards. Journal of Graduate Medical Education, 12(3), 345–346.

https://doi.org/10.4300/JGME-D-20-00265.1

Zolotukhin, S. N., Byndyukova, E. A., & Chigarev, A. G. (2020). Experience in the development

and implementation of a house project by an architect. IOP Conference Series: Materials

Science and Engineering, 753(4), 042031. https://iopscience.iop.org/article/10.1088/1757-

899X/753/4/042031/pdf