Wk 2 – Summative Assessment: Project Communication Matrix

Criteria and Weight Accomplished

90-100% A to A-

Emerging 70-89% B+ to C-

Beginning 50-69% D+ to F

Not Evident 0% F

1. Identify 5 to 7 project communication activities including objective, format, audience, owner, and frequency. Weight: 45%

Identification of the project communication activities was complete.

Identification of the project communication activities was mostly complete.

Identification of the project communication activities was incomplete.

Identification of the project communication activities was not evident.

2. Summarize how a project communication matrix fosters collaboration and productivity with the project team and stakeholders. Weight: 50%

Summary showed insight into project team collaboration with stakeholders.

Summary showed some insight into project team collaboration with stakeholders.

Summary showed little insight into project team collaboration with stakeholders.

Summary showing insight into project team collaboration with stakeholders was not evident.

3. Writing mechanics Weight: 5%

The matrix and summary were concise, with exceptional attention to detail, and was free of writing convention errors (i.e., spelling, punctuation, usage, and sentence formation).

The matrix and summary showed attention to detail through careful editing and quality writing; minimal writing convention errors were present that did not detract from readability of the content.

The matrix and summary lacked detail and careful editing; numerous writing convention errors were present but minimally detracted from the readability of the content.

The matrix and summary contained numerous writing convention errors that significantly detracted from readability.

pm570_v1_wk2_project_communication_matrix_template.docx

PM/570 v1

Project Communication Matrix Template

PM/570 v1

Page 2 of 2

Project Communication Matrix Template

Complete the matrix below to create a basic communication plan for collecting, creating, and distributing information in a timely manner. In the first column, write the type of communication, which is the information being communicated. In the second column, write the objective of that communication type. In the third column, write the format or channel the information will be delivered. In the fourth column, write the audience who will receive this communication. In the fifth column, write the owner for that type of communication. In the sixth column, write the frequency this communication will be provided.

Identify at least 5 to 7 more communication types. Two communication types have been provided in the first two rows.

Write your summary in the space provided below the matrix.

Project Communication Matrix

Communication Type

Objective

Format/Channel

Audience

Owner

Frequency

Executive status report

Update executive team on project status.

Email

Executive team (CEO, COO, CFO), VP of Operations, Project Sponsor, Project Team

Project Manager

Every 2 weeks

Project status update

Share with rest of team what’s been done, what they’re doing, and what needs to be done, and report problems to the project team, and ask for help, if needed.

Real-time audio & video conference

Project Team

Project Manager

Daily

Summary