estimate for the west street video plans given

lolmrsnipe

 

Prepare a detailed estimate and a total estimate for the west street video plans given

  • 2 years ago
  • 15
files (2)

WestStreetVideoPlans1.pdf

  • 3-Video Store A1 (1)
  • 3-Video Store A10 (1)
  • 3-Video Store A2 (1)
  • 3-Video Store A3 (1)
  • 3-Video Store A4 (1)
  • 3-Video Store A5 (1)
  • 3-Video Store A6 (1)
  • 3-Video Store A7 (1)
  • 3-Video Store A8 (1)
  • 3-Video Store A9 (1)
  • 3-Video Store C1 (1)
  • 3-Video Store C2 (1)
  • 3-Video Store E1 (1)
  • 3-Video Store E2 (1)
  • 3-Video Store E3 (1)
  • 3-Video Store FP1 (1)
  • 3-Video Store FP2 (1)
  • 3-Video Store G1 (1)
  • 3-Video Store M (1)
  • 3-Video Store P1 (1)
  • 3-Video Store P2 (1)
  • 3-Video Store S1 (1)
  • 3-Video Store S2 (1)
  • 3-Video Store S3 (1)
  • 3-Video Store S4 (1)
  • 3-Video Store T (1)

FinalExamSpreadsheetF2024.xlsx

Detail

Group Members
Cameron Ekechi
Member
ITEM QUANTITY Responsible
Intitials NOTES
03000 CONCRETE
Rebar
Footing
#4-20' rebar 52 ea
#5-3'6" rebar 32 ea
#6-5' rebar 66 ea
Foundation
Footings and Foundation--Concrete
Footing cyd
Foundation
cyd
Floor--Concrete
5" Concrete slab 48 cyd
04000 MASONARY
05000 Metals
06000 WOOD, PLASTICS, AND COMPOSITES
Lumber
Floor
Walls
Roof
Trusses
Wood Trim
Cabinetry and Countertops
07000 THERMAL & MOISTURE PROTECTION
Insulation
R-13 50 sft roll 82 ea
R-19 50 sft roll 2 ea
Siding
0.019" aluminum cap 240 ft
Clips 480 ft
scuppers 2 ea
Roofing
3"x4'x8' insulation 100 ea
3"x3" cant strip 240 ft
0.55 mill epdm mechanic all fastened 3,825 sft
Rain Gutters
08000 OPENINGS
Metal Doors
Wood Doors
Overhead Doors
Windows
Hardware
09000 FINISHES
Drywall
Ceiling
Walls
Tape lf
Mud gal
Screws ea
Flooring
Paint
Ceiling sft
Walls sft
Doors 5 ea
10000 SPECIALTIES
Toilet & Bath Accessories
24"x36" mirror with frame 1 ea
36" grab bar 1 ea
42" grab bar 1 ea
22000 PLUMBING
Plumbing
Drain,Waste & Vent
Hot & Cold Water Supply
Fixtures
23000 HVAC
26000 ELECTRICAL
Rough Electrical
Finish Electrical
31000 EARTHWORK
Grading and Excavation
Excavate under building 168 cyd
Place soil 72 cyd
Under slab gravel 10 cyd
32000 EXTERIOR IMPROVEMENTS
Site Concrete-Concrete
Sidewalk 14 cyd
Curb 8 cyd
Gutter 1 cyd
33000 UTILITIES
Water Line
4" dia water line 67 ft
Excavation 5.6 cyd
Backfill 5.6 cyd
Sewer Line
4" pipe 83 ft
Excavation 18 cyd
Backfill 14 cyd

&A

&D &T &Z&F &P of &N

Labor Rates

Cost Code $/LHR
03000 Concrete 19.00
04000 Masonary 27.00
06100 Rough Carpentry 22.00
06110 Lumber 22.00
06120 Trusses 22.00
06210 Wood Trim 26.00
06400 Cabinetry and Countertops 26.00
07200 Insulation 22.00
07220 Stucco 26.00
07400 Siding 22.00
07500 Roofing 22.00
07710 Rain Gutters 22.00
08000 Openings 26.00
09200 Drywall 24.00
09300 Ceramic Tile 27.00
09600 Flooring 27.00
09900 Paint 24.50
10210 Toilet & Bath Accessories 26.00
22000 Plumbing 29.00
23000 HVAC 29.00
26000 Electrical 29.00
32000 Excavation 25.00
32000 Exterior Improvements 19.00
33000 Utilities 23.00