WBS Work Breakdown Structure for Group 7 Cost Management Group Project Prepared by: Kedar Dhital, Kayleigh Saleone, Andrew Steck Date: 10/1/2017
1. Group Charter 1.1. Create a group project charter using the template provided
1.1.1. A name for the project (it does not have to be the name of your final video)
1.1.2. Budget information 1.1.3. A list of group members and their roles 1.1.4. The project's objectives 1.1.5. The main criteria for determining success 1.1.6. An outline of approach 1.1.7. The time frame in which it will be completed
2. Scope Statement 2.1. Create a group Scope Statement
2.1.1. Product characteristics and requirements 2.1.2. Summary of project deliverables 2.1.3. Acceptable success criteria
3. WBS 3.1. Create a Group WBS
3.1.1. Must use PMI’s 5 process Groups 3.1.2. Must be based on Scope Statement 3.1.3. Must breakdown all elements required to complete the project into
individual tasks 4. Milestone List
4.1. Create a Milestone List 4.1.1. Include at least five milestones with estimated completion dates for those
milestones 5. Cost Estimate
5.1. Develop a project cost estimate 5.1.1. Estimate must be based on if a it was developed by a business 5.1.2. Estimate number of work hours to complete 5.1.3. Determine reasonable hourly rates
5.1.3.1. Cite references 5.1.4. Include all additional resources and cost
5.1.4.1. Such as hardware, software, materials, etc... 6. Quality Checklist
6.1. Create a project quality checklist
This study source was downloaded by 100000785772547 from CourseHero.com on 06-28-2022 17:35:41 GMT -05:00
https://www.coursehero.com/file/86087532/Group-Project-WBSdocx/
6.1.1. List at least 5 criteria that will ensure the project is completed successfully 6.1.2. Define at least two quality metrics to evaluate the project by.
7. Probability/ Impact Matrix & Risk Register 7.1. Create a Probability/ Impact Matrix & Risk Register
7.1.1. List at least five risk 7.1.2. Each Risk must include
7.1.2.1. An ID number 7.1.2.2. Ranking 7.1.2.3. Name 7.1.2.4. Description 7.1.2.5. Category 7.1.2.6. Root cause 7.1.2.7. Triggers 7.1.2.8. Potential responses 7.1.2.9. Rick owner
7.1.2.10. Impact 7.1.2.11. Status 7.1.2.12.
8. Final Video 8.1. Create a video
8.1.1. Collaboratively develop 8.1.2. Collaboratively script 8.1.3. Collaboratively Produce 8.1.4. Must be 5 to 8 minutes in length 8.1.5. Must be meet the requirements to upload to the YouTube website
8.1.5.1. File formats MOV, MPEG4, AVI, WMV, MPEG-PS, FLV, 3GPP or WebM
8.1.5.2. Must have legal rights to the audio and video 8.1.5.3. Must not include inappropriate public content
8.2. Paste URL of uploaded video to Group Project Discussion Forum