Week 6 to Week 9
7/17/2020 Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReport/ultra?attemptId=f29d7f56-ca08-49f0-b36a-a27c2e7e080… 1/4
%100
SafeAssign Originality Report Summer 2020 - Initiating the Project (BADM-634-21) - Full Term • Problem Set #8
%100Total Score: High riskDeepa Narayana Navalkar Submission UUID: 667fd4de-dda6-a674-14b5-32b4c8f52cdd
Total Number of Reports
1 Highest Match
100 % Week8WBSwithActivityListExercise3 (2).d…
Average Match
100 % Submitted on
07/08/20 01:13 PM EDT
Average Word Count
426 Highest: Week8WBSwithActivityListExerci…
%100Attachment 1
Institutional database (2)
Student paper My paper
Top sources (2)
Excluded sources (0)
View Originality Report - Old Design
Word Count: 426 Week8WBSwithActivityListExercise3 (2).docx
1 2
1 Student paper 2 My paper
WORK BREAKDOWN STRUCTURE WITH ACTIVITY LIST
Instructions: You will use the Week 2 Business Case project to complete the WBS Structure with Activity List exercise (copy and paste the Business Case as usual).
During Week 7 you identified six (6) Key Deliverables that were required to complete the project within scope. For this week’s exercise you will identify three (3) activities that need to be completed to create the overall Key Deliverable. (See Exhibit 8.3 on page 251 for an example).
Business Case:News source (APA reference): Jeff Kiger, (2020). A new fitness center is on the way for Northwester Rochester. Retrieved from
https://www.postbulletin.com/business/small-business/6520787-A-new-fitness-center-is-on-the-way-for-Northwest-Rochester
Web address: https://www.postbulletin.com/business/small-business/6520787-A-new-fitness-center-is-on-the-way-for-Northwest-Rochester.
City: Rochester
Elevator Pitch - the anytime fitness workout studio is planning to put up a fitness center and you 7360 square foot building on open land at 4181 space 31st Ave
behind an O’Reilly auto parts Store and across 31st Ave from Mayo clinic’s 41st street campus later in the year. the project is geared at providing a 24 hour exercising center where members can access weights and cardio machines to improve their general health. The fitness workout studio will offer residence of Rochester an opportunity to work out anytime of the day. The residents will be expected to subscribe for a membership to benefit from the center once its construction is complete.
Building a fitness centre
Renovation project
1. Project Management
1.1 Scope management
1.2 Communication management
1.3Schedule management
2. Detailing the project 2.1 Developing project management deliverables
2.2 Evaluation of the Schedule of previous completed projects
2.3 Building elements checklist
1
1
2
2
2
1
1
7/17/2020 Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReport/ultra?attemptId=f29d7f56-ca08-49f0-b36a-a27c2e7e080… 2/4
Source Matches (11)
Student paper 100% Student paper 100%
3. Plan of the project cost
3.1 Business case and project brief
3.2 Project drawings
3.3 Project plan strategy
4. Detailing Design & Tender
4.1 Tender for renovating Michigan central train station 4.2 Enabling works design and tender
4.3 Appointing of contractors
5. Construction 5.1 Analysis of the materials needed
5.2 overall constructions
5.3 Establishment of a project tasks
6. Deliverables management
6.1 Tracking of the progress of the project
6.2 Checklist of deliverables
6.3Establishment of the plan forward
7. Closure of the project
7.1 Checking deliverables are in line with the project objectives
7.2 Approval of closing the project
7.3 Submission of end stage report and demobilization of contractors
1
1
1
1
1
Student paper
WORK BREAKDOWN STRUCTURE WITH ACTIVITY LIST
Original source
WORK BREAKDOWN STRUCTURE WITH ACTIVITY LIST
1
Student paper
You will use the Week 2 Business Case project to complete the WBS Structure with Activity List exercise (copy and paste the Business Case as usual). During Week 7 you identified six (6) Key Deliverables that were required to complete the project within scope. For this week’s exercise you will identify three (3) activities that need to be completed to create the overall Key Deliverable. (See Exhibit 8.3 on page 251 for an example).
Original source
You will use the Week 2 Business Case project to complete the WBS Structure with Activity List exercise (copy and paste the Business Case as usual) During Week 7 you identified six (6) Key Deliverables that were required to complete the project within scope For this week’s exercise you will identify three (3) activities that need to be completed to create the overall Key Deliverable (See Exhibit 8.3 on page 251 for an example)
7/17/2020 Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReport/ultra?attemptId=f29d7f56-ca08-49f0-b36a-a27c2e7e080… 3/4
My paper 95%
My paper 100%
My paper 100%
Student paper 72%
Student paper 83%
2
Student paper
Business Case:News source (APA reference): Jeff Kiger, (2020). A new fitness center is on the way for Northwester Rochester. Retrieved from https://www.postbulletin.com/business/s mall-business/6520787-A-new-fitness- center-is-on-the-way-for-Northwest- Rochester
Original source
News source (APA reference) Jeff Kiger, (2020) A new fitness center is on the way for Northwester Rochester Retrieved from https://www.postbulletin.com/business/s mall-business/6520787-A-new-fitness- center-is-on-the-way-for-Northwest- Rochester
2
Student paper
https://www.postbulletin.com/business/s mall-business/6520787-A-new-fitness- center-is-on-the-way-for-Northwest- Rochester.
Original source
https://www.postbulletin.com/business/s mall-business/6520787-A-new-fitness- center-is-on-the-way-for-Northwest- Rochester
2
Student paper
Elevator Pitch - the anytime fitness workout studio is planning to put up a fitness center and you 7360 square foot building on open land at 4181 space 31st Ave behind an O’Reilly auto parts Store and across 31st Ave from Mayo clinic’s 41st street campus later in the year. the project is geared at providing a 24 hour exercising center where members can access weights and cardio machines to improve their general health. The fitness workout studio will offer residence of Rochester an opportunity to work out anytime of the day. The residents will be expected to subscribe for a membership to benefit from the center once its construction is complete.
Original source
Elevator Pitch - the anytime fitness workout studio is planning to put up a fitness center and you 7360 square foot building on open land at 4181 space 31st Ave behind an O’Reilly auto parts Store and across 31st Ave from Mayo clinic’s 41st street campus later in the year the project is geared at providing a 24 hour exercising center where members can access weights and cardio machines to improve their general health The fitness workout studio will offer residence of Rochester an opportunity to work out anytime of the day The residents will be expected to subscribe for a membership to benefit from the center once its construction is complete
1
Student paper
1.1 Scope management 1.2 Communication management
Original source
1.1 Schedule management 1.2 Scope management
1
Student paper
Detailing the project 2.1 Developing project management deliverables 2.2 Evaluation of the Schedule of previous completed projects 2.3 Building elements checklist
Original source
2.1 Develop project management deliverables 2.2 Schedule of previous works completed 2.3 Building elements checklist
7/17/2020 Originality Report
https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReport/ultra?attemptId=f29d7f56-ca08-49f0-b36a-a27c2e7e080… 4/4
Student paper 89%
Student paper 100%
Student paper 94%
Student paper 100%
1
Student paper
Plan of the project cost 3.1 Business case and project brief 3.2 Project drawings
Original source
Project plan and Generic cost plan 3.1 Business case and project brief 3.2 Project drawings
1
Student paper
4.1 Tender for renovating Michigan central train station 4.2 Enabling works design and tender 4.3 Appointing of contractors
Original source
4.1 Tender for renovating Michigan central train station 4.2 Enabling works design and tender 4.3 Appointing of contractors
1
Student paper
6.1 Tracking of the progress of the project 6.2 Checklist of deliverables 6.3Establishment of the plan forward
Original source
6.1 Tracking of the progress of renovation 6.2 Checklist of deliverables 6.3Establishment of the plan forward
1
Student paper
Closure of the project 7.1 Checking deliverables are in line with the project objectives 7.2 Approval of closing the project 7.3 Submission of end stage report and demobilization of contractors
Original source
Closure of the project 7.1 Checking deliverables are in line with the project objectives 7.2 Approval of closing the project 7.3 Submission of end stage report and demobilization of contractors