VERY URGENT 1 HOUR TO GO VSM PROJECT HW

AHMET
ValueStreamSymbols.pdf

Good

Customer or Supplier Computer

Push (bad)

Pull (good)

Frequent Withdrawal (good)

___ Days on hand

Stagnation (bad)

Process Box Process

Material and Information Flow Icons

X

FIFO Lane

Linked Processes

Kanban rack (supermarket)

Data Box

Customer or Supplier Delivery

Before Problem, Poor Condition

Bad

Kaizen, After Condition

or Good Idea

Operator

Process must be constantly watched. Bad condition, not

self-managing.

Schedule Box

C/T =

C/O =

Downtime =

# operators =

Defect rate =

Takt=

Forecast (Electronic)

Order (Electronic)

OXOX

Load LevelingManual Information flow Schedule

Kanban Post

Process 1 Process 2 Process 3

Withdrawal Kanban

Production Kanban

Signal Kanban

Make your own symbols

too.