Value Stream Mapping

Brishna
Template_Assignment1.pptx

JWI 550 Operational Excellence

Insert Date

Insert Name

Jack Welch Management Institute

Value Stream Mapping and Analysis: Assignment 1

1

Current State Value Stream Map

Title:

Takt time/Demand rate:

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

Customer

Insert text

Insert text

Insert text

Insert text

Insert text

Please complete the VSM, add data, add the information flow, and add summary timeline. Delete red text before submission. Refer to page 87 or 89 in the VSM text.

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

Insert text

The Process step goes on top

Who performs the step goes here

Insert LT

Insert PT

Insert LT

Insert PT

Insert LT

Insert PT

Insert LT

Insert PT

Insert LT

Insert PT

Insert LT

Insert PT

Total LT* =
Total PT* =
Activity Ratio** =
Rolled %C&A*** =

* Total LT and PT are calculated by summing the LT and PT values for all processes.

** Activity Ratio is calculated by dividing the Total PT by Total LT and is listed as a percentage.

*** Total %C&A is the Rolled %C&A, which is calculated by multiplying the %C&A for all processes and is listed as a percentage.

IT

2

Value Stream Current State Overview

Overview of the Process

Describe the process here

Challenges

List and briefly describe the challenges here

List and briefly describe the challenges here

List and briefly describe the challenges here

Bottlenecks

List and briefly describe the bottlenecks here

List and briefly describe the bottlenecks here

List and briefly describe the bottlenecks here

References

Martin, K. & Osterling, M. (2014). Value Stream Mapping.

3