Project
Project
Submission date: 17-Jun-2020 11:09PM (UTC+1200) Submission ID: 1345334696 File name: AUT-OSC-Project.pdf (2.2M) Word count: 1406 Character count: 7388
Operations and Supply Chain Management
BSYS841
Trimester 1, 2020
Assessment 3: Project
A Proposal for Supply Chain Management
of Jory Henley Furniture
Student:
ID:
Tutor:
Assessment #3: Supply Chain Management Project
Contents
1 Executive Summary ....................................................................................... 2
2 Introduction ................................................................................................. 3
3 The problems of the company from SCM perspective ............................................. .4
4 Re sponse to the problems ................................................................................... 5
5 Justification for the new SCM solution ................................................................... I 0
6 Conclusion ................................................................................................... I 0
7 Reference ................................................................................................... 11
Assessment #3: Supply Chain Management Project
Executive Summary
This proposal is about a possible solution to a particular supply chain management problem of Jory
Henley Furniture.
There are five main parts of this proposal. Firstly, it is the background introduction of Jory Henley
Furniture. Moreover, it is identification and analysis of the problem in SCM, which is the increase
in cost resulting from the unnecessary product transfer between different branches. Furthermore, a
solution to the problem will be suggested, which includes two steps, such as establishing a central
warehouse and apply in weighted moving average to forecast the demand. In addition, it will
critically evaluate the feasibility of the response. Finally, it is the conclusion.
Assessment #3: Supply Chain Management Project
Introduction
Jory Henley is a ew Zealand furniture retail brand with its head office in Australia. It offers an
exten sive selection of furniture from lounge units, bedroom, living to the dining room. Products
can be divided into three categories , made in ew Zealand, Australia and China. Its
competitivenes s comes from differentiated furniture imported from Australia and China.
Since it s ettled in Auckland in 2015, it had expanded wildly and opened 5 stores in a row until end
of 2018, covering an area of 1000-4000 square meters per mall. However, in 2019, a serious
difficulty is the increase in profit cannot cover the boosted cost of s upply chain management (SCM),
which lead the owners had to determine to close two stores. Figure 1 illustrates the location of the
current branches of Jory Henley, such as Manukau branch (2000 m2 ), Mt Willington branch ( 4000
m2 ) and orth shore branch ( 1000 m2 ), a big showroom and a small warehouse belong to each
branch. In thi s report, it will identify and analyze the SCM problem, suggest a solution and
Justification.
- IOf)' he:nley furniture
V1t1fy info wrth pla�$
Hours or S4!MCH m� d1ff!r dUfl to COVIO· l 9
Jory Het'lley Ftnlture W&lrau P,,.
�···· Q 1-Ul'nllJrc.:iho:Jp 11 .nl;O,
Ope,un'lilS.JO� 09-44Jll52 '
Jory Hl!l'lle)' Fumi1ure Newmarll:et 50 ......
Q f-UrnrtJ�SholJ ' Klfn1SI Ckised Opens al 1000 ;MT1 w.(1511• oi; s2011sa
Jory Henley H•*•• F111n1tJr,p,�p
Q Unrl 1D,M.riuk11.1SupaCe"t1. 72 CilY�ll(l'th()I' Wei:lsrte Oi-a un• !,·30 r-n 09 161 �6":10
Jory Hl!nle;' Fwmture Botany Store
"iO **••• Q
rlJl'flllJlfShop 1h11 Hi.ti 4�1 T1 M.ik.iu Dr
\'l'd:11•� Open u�il 5.JO p,n l»-265 1�81
JoryHl!!l'llt'y
l-11rrut1r-.shop 43Cabn8Rd Q
Open u/11. S,lOpn, 09-2515092
Sho-,.,itg,--.11, •
�a•Pr.wfl� ..,.tlfft�IT'IO•'t'fl
Q. "'
X
.,--'
>
0
_,,..,, +in-,, .. 1.u
0
,,_,..
0
Dnc:t1ons
0
O.O<tlM•
0
Ri11r-rhl-ad f-O'�it
·-
......
QI
..,,.ti,tu
V
� ... ,,.,,�,� �lrauP1ri:
N11.l1jj l,JI' 'c;l;lno' l!'(1
,,..,..
Go gJo
Figure 1: The Location of the branches of Jory Henley
3
W:uhir:le 1sl1rd
"""'""'"' Island
•
i"'
Assessment #3: Supply Chain Management Project
The problems of the company from SCM perspective
One of the biggest problems about SCM of Jory Henley is a sale plan normally big differences with
the actual demand of each branch, resulting in a high cost to transfer the stuff between branches.
The cost of those unjustified product transfer mainly comes from the expense of fuel of trucks and
labour of driver s. Due to the limitation of warehouse size and the requirement for rapid inventory
turnover, the company adopts the purchase method of a small lot size and multi-batch. After the
containers arriving at the port regularly every month are unloaded, the stuff imported has to be
allocated and store in the three branches based on the plan & goals for that month, because there is
no uniform distri bution centre or big warehouse. Each branch is equipped with a truck and two
driver s. Besides delivering goods to customers, another important role of trucks is to transfer
product between different branches. For instance, a customer bought a product in the Manukau
branch after viewing the floor-model in the showroom (Floor model typically can not be allowed
to sold). The stock of the product in the SCM system displayed O in this branch but 2 stock in orth
shore branch. Thus, the truck of the Manukau branch will go to transfer the product back from the
or th shore branch, then deliver to the customer. Things like this happen almos t every day for
different kind of furniture, which means that plan of the original distribution and storage of goods
may be unreasonable. According to the data from the SCM system, the average cost per transfer
trip is $89, it may result in a huge loss for long-run.
The sale plan was typically made based on the quantity in actual sales of last month and the left
space of the small warehouse back of the branch. Take one of the imported products called Franklin
electric recliner sofa as an example (Table 1 ). When the quantity of original plan lower than actual
demand (The orange numbers in Table 1 ), the transfer must happen or waiting s tock coming.
Assessment #3: Supply Chain Management Project
anukau Branch Mt Willin ton
orth hor Branch Branch
onth
Aug, 2019
Sept, 2019
Oct, 2019
o ,2019
Dec, 2019
Jan,2020
Feb,2020
Mar 2020
ctual Demand
25
27
30
33
4
36
40
,8
Original ctual Plan Demand
24 6
27 JO
28 10
30 14
2 12
33 13
36 14
40 15
The data i from the s st m of Jory Henle
Original ctual Plan Demand
7 18
8 21
8 22
10 22
14 2
12 20
12 27
14 17
Table 1: The actual demand and ori ginal plan (sale plan)
of Franklin electric recliner ofa
Original Plan
16
18
20
20
21
20
22
29
Response to the problems
According to the SCM problem and the actual situation of Jory Henley, a new possible solution
could be two steps. As can be seen in Figure 2, the first step is repositioning function of the three
branches. Figure 3 illustrates the new function position of the business branches. The Mt Willington
branch is located between the other two stores, and its size is the largest, with 4000 square meters,
so that it could be a big warehouse and office. Meanwhile, only one quarter in front of it can be
still allocated and retained a small exhibition hall. On the other hand, the other branches keep
running with no change in function. When the new goods arrive at the port, they are unified into
the large warehouse at Mt Willington branch, and the warehouse is distributing and delivering
products according to the forecast and plan of each branch. After this setting, it will no longer
happen that goods transfer between the orth shore store and Manukau store. Thereby, it can save
time and cost.
Assessment #3: Supply Chain Management Project
e, po ible solution to the problem
tep I: Repo itioning function of the thr branch.
2 tor + I Big arehou
(in luding a mall howroom)
tep 2: Reasonable calculation and formulation of tock di tribution and
plan.
Foreca ting ofth d mand b m erag and
mg a erag
Figur 2: The n , po ibl olution to th probl m
Service
radius
Service
radius
Service
radius
u r nch
ur : Th n fun tion la o t of th branch of Jory Ilenl
6
Assessment #3: Supply Chain Management Project
In the second step, it should reasonably calculate and formulate of stock distribution and storage
plan. Weighted moving average will be applied to forecast the product demand of each branch. It
assigns more weight to recent data for 3-month weighted moving average, in this case, 1 for three
months ago, 2 for two months ago, 3 for last month. According to the formula:
1:[(Weighted for period 3)(Demand in period 3)] Weighted moving average =
3
Therefore, the result can be seen in Table 2, and Figure 4 shows the difference between actual
demand, original plan and the forecasting demand by weighted moving average methods. It can be
seen, the results predicted by weighted moving average are always closer to the actual demand.
Assessment #3: Supply Chain Management Project
Month
Aug, 2019
Sept, 2019
Oct., 2019
Nov, 2019
Dec, 2019
Jan,2020
Feb,2020
Mar, 2020
Actual Demand
25
27
30
33
34
36
40
38
Manukau Branch
3-Month Original Weighted
Plan Moving Average (WMA-M)
24
27
28
30 28.17
32 31
33 33
36 34.83
40 37.67
Mt Willington Branch North shore Branch
3-Month 3-Month Actual Original Weighted Actual Original Weighted
Demand Plan Moving Average Demand Plan Moving Average (WMA-M) (WMA-M)
6 7 18 16
10 8 21 18
10 8 22 20
14 10 9.33 22 20 21
12 14 12 23 21 21.83
13 12 12.33 20 20 22.5
14 12 12.83 27 22 21.33
15 14 13.33 17 29 24
Table 2: The forecasting of demand by using 3-Month weighted moving average
Assessment #3: Supply Chain Management Project
Manukao Branch
Actual demand vs. Weighted
moving average and Original
plan
45 I
40 � I 1 6
35 �/ I 14
30
�
12
25 10
20 8
15 I 6
10 4
5 2
0 0 Aug, Sept, Oct, Nov, Dec, Jan, Feb, Mar,
2019 2019 2019 2019 2019 2020 2020 2020
-Manukau Branch Actual Demand
-Manukau Branch Original Plan
-Manukau Branch WMA-M
Mt Willington Branch
Acutual demand vs.
Weighted
moving average and Original
plan
- - - - - - -
,�-
,--J/· �
r
Aug, Sept, Oct, Nov, Dec, Jan, Feb, Mar,
2019 2019 2019 2019 2019 2020 2020 2020
-Mt Willington Branch Actual Demand
-Mt Willington Branch Original Plan
-Mt Willington Branch WMA-W
North shore Branch
Actual demand vs. Weighted
moving average and Original
plan
35
30
II 2 5
20
15
10
5
0 Aug, Sept, Oct, Nov, Dec, Jan, Feb, Mar,
2019 2019 2019 2019 2019 2020 2020 2020
-Northst,o,, B<a,ch A«o• :J -North shore Branch Original Plan
-North shore Branch WMA-N
Figure 4: Actual demand vs. Weighted moving average and Original plan of the three branches
Assessment #3: Supply Chain Management Project
Justification for the new SCM solution
Moving-average is a significant method to forecast when people assume that market demands will
stay fairly steady over time. Meanwhile, when a detectable trend or pattern is present, weights can
be used to place more emphasis on recent values (Heizer, Render & Munson, 2014). In this case,
before the lockdown of COVID-19 in ew Zealand, the furniture market was relatively stable.
From the data, it can see that the actual demand for different branches was basically increasi ng
steadily. Thus, the weighted moving average method can be used in SCM of Jory Henley and it
closer to the actual demand. As a consequence, it can reduce the frequency of product transfer
between difference branches, the distribution of goods is close to the actual sales situation at the
beginning. Furthermore, since the new large warehouse is located between the two stores, even if
there are some necessary transfers, it is still convenient and cost-saving.
However, as the market was locked down in April, if the demand for July is to be predicted, i t may
be possible to take advantage of actual sales data in March, May and June.
Conclusion
One SCM problem of Jory Henley is the high-cost caused by unnecessary product transfer due to
the unreasonable plan. This proposal gives a possible solution including two steps, which are re
function the Mt Willington branch to a center warehouse between the other two branches and using
the approach of weighted moving average to forecast the demand. This suggestion can effectively
reduce the unnecessary transfer of goods to reduce losses.
( I 093 words)
10
Assessment #3: Supply Chain Management Project
References
Heizer, J., Render, B., & Munson, C. (2020). Operations Management-Sustainability and supply chain management (I 3 th). London, United Kingdom: Pearson.
II
FINAL GRADE
/100
Project GRADEMARK REPORT
GENERAL COMMENTS
Instructor
PAGE 1
PAGE 2
PAGE 3
PAGE 4
PAGE 5
PAGE 6
PAGE 7
PAGE 8
PAGE 9
PAGE 10
PAGE 11
PAGE 12
- Project
- by Feifan Dai
- Project
- GRADEMARK REPORT
- FINAL GRADE
- GENERAL COMMENTS
- Instructor