resources as well as budget since both of these work hand in hand and are essential to

facilitate the completion of a given project (Pinto, 2019). While discussing about some of the

constraints in a business, it is clear from the owner’s perspective that there may be project

managers who may not be willing to work with each other. The unavailability of costs, reduced

equipment, inefficient sub-contractors as well as a limited number of technicians also depict

some of the constraints at Sunrise Restoration and Remodeling. From the scenario, there is

the rule on First Come First Served which is mainly meant for the purpose of avoiding the

misuse of technicians and equipment. Nonetheless, this has not yet turned out in the favor of

Ken, because he has been clever in the way he works out his cases. 1 IN ADDITION,

THERE IS NO RESERVATION POLICY THAT MAKES IT SOMEWHAT HARD

FOR PLANNING OTHER PROJECTS.

3 2) IS SUNRISE’S CURRENT MODEL OF PRIORITIZING RESOURCE

ASSIGNMENTS VIABLE? 1 WHY OR WHY NOT?

It is clear from the scenario that the existing method of prioritizing resources assignment

available is not really viable. This is because some of the existing practices of the first come

first serve basis are not really effective since the project managers may not be able to plan

their future endeavors. 4 FOR INSTANCE, AS A RESULT OF THE REDUCED

NUMBER OF EQUIPMENT, I THINK THAT TYLER WAS NOT ABLE TO GET THE

EQUIPMENT THAT DELAYED HIS PART OF THE PROJECT FOR AROUND 3

DAYS WHILE THE EQUIPMENT WAS GETTING USED BY KEN. 1 THIS MIGHT

BE A SMALL COMPANY, BUT IT DOES INCLUDE MORE THAN TWO PROJECT

MANAGERS AND IT IS HIGHLY LIKELY FOR THE THIRD MANAGER TO GET

HOLD OF EQUIPMENT BEFORE TYLER, WHICH WOULD BE A VERY BAD

SCENARIO FOR THE PROJECT. IF THE PROJECT MANAGER’S MAIN

CONCERN DRILLS DOWN ON HOW TO GET HOLD OF EQUIPMENT FIRST, HIS

OTHER PROJECT RELATED ACTIVITIES WILL BE IN TROUBLE. FIRST COME

FIRST SERVED BASES COULD HOLD GOODS IF IT HAS A RESERVATION

SYSTEM; THIS MEANS THAT THE FIRST AVAILABLE PERSON TO RESERVE

THE UNIT FOR FUTURE ACTIVITY SHOULD BE ALLOWED TO USE IT. THIS

MOVE GIVES ENOUGH TIME FOR PROJECT MANAGERS TO PLAN

ACCORDINGLY (PINTO, 2019). ALSO, THIS WOULD FALL UNDER LUCK

CATEGORY OF THE PROJECT MANAGER GETTING THE EQUIPMENT EVEN

AFTER 3RD DAY.

8/2/2020 SafeAssign Originality Report

https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_115684_1&paperId=3185157121&&att… 3/11

3) HOW COULD TECHNOLOGY ALLEVIATE SOME OF SUNRISE’S RESOURCE

MANAGEMENT ISSUES?

4 THESE 3 DAYS OF IDLENESS NOT ONLY INCUR PROJECT TIME DELAY,

BUT BOTH WORKERS AS WELL AS THE PROJECT MANAGERS ARE

SUPPOSED TO BE PAID. 1 IF ANY FOLLOW-UP ACTIVITY IS BEING

PLANNED, THIS WOULD RESULT IN JEOPARDY; these activities include external

parties/vendors. 1 OTHER THAN THIS, SOME OF THE FEES TO ACCOMMODATE

INCLUDE UPDATED TIME OR DAY SETTING WILL BE INCURRED. 4 DESPITE

THE FACT THAT NOT ALL PROJECT MANAGERS WOULD WANT THEIR PLANS

TO BE DISCLOSED TO ONE ANOTHER, TECHNOLOGY CAN HELP KEEP THE

REST OF THE PLAN HIDDEN FROM OTHER PROJECT MANAGERS AND ONLY

HIGHLIGHT THE CONFLICTING PARTS. 1 IN THIS SCENARIO, THE PROJECT

MANAGEMENT RELATED SOFTWARE CAN BE REALLY HELPFUL TO

UNDERSTAND AVAILABILITY OF GIVEN RESOURCE IN FUTURE CASES.

TECHNOLOGY HAS BEEN VERY HELPFUL IN DEALING WITH SITUATIONS

LIKE THE ONES MENTIONED IN GIVEN CASE STUDY PERTAINING TO

RESOURCE MANAGEMENT. AS MENTIONED ABOVE, THE RESERVATION

SYSTEM WOULD HELP THE PROJECT MANAGERS TO EFFICIENTLY PLAN

FOR THE PROJECT (PINTO, 2019). IF ALL PROJECT MANGERS’ PLANS ARE

HIGHLIGHTED UNDER ONE APPLICATION, IT WOULD SHOW ALL

CONFLICTING ACTIVITIES OR RESOURCE ALLOCATION BEFOREHAND

GIVING THE PROJECT MANAGER ENOUGH TIME TO NEGOTIATE OR LOOK

OUT FOR ALTERNATIVES AND PROVIDE TIMELINE ESTIMATES

ACCORDINGLY.

4) WOULD TYLER’S SUGGESTION TO HIRE ADDITIONAL TECHNICIANS AND

PURCHASE MORE EQUIPMENT SOLVE THE RESOURCE PROBLEMS AT

SUNRISE? WHY OR WHY NOT?

TIME IS THE PROBLEM. THAT BEING SAID, A SOLUTION SHOULD COME

OUT DEALING WITH HOW THE EQUIPMENT WOULD BE EQUALLY

AVAILABLE TO ALL PROJECT MANAGERS AND ON TIME. 4 ADDING NEW

EQUIPMENT WOULD INCREASE THE IDLE TIME WHICH WILL LATER

CONSUME UP THE BUDGET FROM THE COMPANY, RENDERING IT NON

8/2/2020 SafeAssign Originality Report

https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_115684_1&paperId=3185157121&&att… 4/11

EFFICIENT. 1 AS RIGHTLY STATED, THE ISSUE HAS OCCURRED FOR JUST A

SINGLE PROJECT MANAGER OUT OF MANY, HENCE IT CONSIDERED MORE

SUBJECTIVE THAN OBJECTIVE. THE PROJECT MANAGER NEEDS TO BE CO-

OPERATIVE AND WORK THE WAY OTHER PROJECT MANAGERS WOULD,

THAT IS; not complaining. 4 TYLER’S SUGGESTIONS ARE BASED ON HIS

CURRENT PROJECT, THUS, HIS SUGGESTIONS TO ADD TECHNICIANS AND

PROCURE MORE EQUIPMENT IS NOT GOING TO SOLVE OVERALL PROBLEM.

1 IT MIGHT SOLVE HIS PROBLEM PERTAINING TO HIS PROJECT, BUT IT

WILL CREATE PROBLEM FOR HIS OWNER ESPECIALLY ON THE IDLENESS

OF EQUIPMENT. The main problem is with equipment not available on given time and

since some of the effective technicians have proven to be rather limited in number, Sunrise

Restoration and Remodeling faces similar difficulty as other companies (Pinto, 2019).

Besides, the company does not really have a big list when it comes to effective sub-contractors

who get hired at reduced costs and give great results.

References

Pinto, J. K. (2019). Project management: 3 ACHIEVING COMPETITIVE

ADVANTAGE. New York, NY:

Citations (4/4)

Matched Text

1 Another student's paper

2 Another student's paper

3 Another student's paper

4 Another student's paper

Suspected Entry: 100% match

Uploaded - Problem Set-12.docx UNIVERSITY OF THE CUMBERLANDS

Source - Another student's paper University of the Cumberlands

8/2/2020 SafeAssign Originality Report

https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_115684_1&paperId=3185157121&&att… 5/11

Suspected Entry: 63% match

Uploaded - Problem Set-12.docx IN ADDITION, THERE IS NO RESERVATION POLICY THAT MAKES IT SOMEWHAT HARD FOR PLANNING OTHER PROJECTS

Source - Another student's paper Additionally, from the looks of context, there is no reservation policy which makes it difficult for planning the projects

Suspected Entry: 100% match

Uploaded - Problem Set-12.docx WHY OR WHY NOT

Source - Another student's paper Why or why not

Suspected Entry: 98% match

Uploaded - Problem Set-12.docx THIS MIGHT BE A SMALL COMPANY, BUT IT DOES INCLUDE MORE THAN TWO PROJECT MANAGERS AND IT IS HIGHLY LIKELY FOR THE THIRD MANAGER TO GET HOLD OF EQUIPMENT BEFORE TYLER, WHICH WOULD BE A VERY BAD SCENARIO FOR THE PROJECT

Source - Another student's paper This might be a small company but it does include more than two project managers and it is highly likely for the third manager to get hold of equipment before Tyler, which would be a very bad scenario for Tyler’s project

Suspected Entry: 91% match

Uploaded - Problem Set-12.docx IF THE PROJECT MANAGER’S MAIN CONCERN DRILLS DOWN ON HOW TO GET HOLD OF EQUIPMENT FIRST, HIS OTHER PROJECT RELATED ACTIVITIES WILL BE IN TROUBLE

Source - Another student's paper If the project manager’s main concern drill down to HOW to get hold of equipment first, his other project related activities will be in trouble

Suspected Entry: 91% match

Uploaded - Problem Set-12.docx FIRST COME FIRST SERVED BASES COULD HOLD GOODS IF IT HAS A RESERVATION SYSTEM

Source - Another student's paper First Come First Served bases could hold good, if it has a Reservation system

Suspected Entry: 92% match

8/2/2020 SafeAssign Originality Report

https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_115684_1&paperId=3185157121&&att… 6/11

Uploaded - Problem Set-12.docx THIS MEANS THAT THE FIRST AVAILABLE PERSON TO RESERVE THE UNIT FOR FUTURE ACTIVITY SHOULD BE ALLOWED TO USE IT

Source - Another student's paper First available person to reserve the unit for future activity, should be allowed to use it

Suspected Entry: 70% match

Uploaded - Problem Set-12.docx THIS MOVE GIVES ENOUGH TIME FOR PROJECT MANAGERS TO PLAN ACCORDINGLY (PINTO, 2019)

Source - Another student's paper This gives enough time for project manager to plan accordingly

Suspected Entry: 100% match

Uploaded - Problem Set-12.docx ALSO, THIS WOULD FALL UNDER LUCK CATEGORY OF THE PROJECT MANAGER GETTING THE EQUIPMENT EVEN AFTER 3RD DAY

Source - Another student's paper Also, this would fall under luck category of the project manager getting the equipment even after 3rd day

Suspected Entry: 93% match

Uploaded - Problem Set-12.docx 3) HOW COULD TECHNOLOGY ALLEVIATE SOME OF SUNRISE’S RESOURCE MANAGEMENT ISSUES

Source - Another student's paper How could technology alleviate some of Sunrise's resource management issues

Suspected Entry: 65% match

Uploaded - Problem Set-12.docx IF ANY FOLLOW-UP ACTIVITY IS BEING PLANNED, THIS WOULD RESULT IN JEOPARDY

Source - Another student's paper If any follow on activity is being planned which include external parties/vendors, that would be in jeopardy

Suspected Entry: 78% match

Uploaded - Problem Set-12.docx OTHER THAN THIS, SOME OF THE FEES TO ACCOMMODATE INCLUDE UPDATED TIME OR DAY SETTING WILL BE INCURRED

Source - Another student's paper Fees to accommodate in updated time/day setting will be incurred

8/2/2020 SafeAssign Originality Report

https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_115684_1&paperId=3185157121&&att… 7/11

Suspected Entry: 82% match

Uploaded - Problem Set-12.docx IN THIS SCENARIO, THE PROJECT MANAGEMENT RELATED SOFTWARE CAN BE REALLY HELPFUL TO UNDERSTAND AVAILABILITY OF GIVEN RESOURCE IN FUTURE CASES

Source - Another student's paper Here is where project management related software can be really helpful to understand availability of given resource in future time

Suspected Entry: 93% match

Uploaded - Problem Set-12.docx TECHNOLOGY HAS BEEN VERY HELPFUL IN DEALING WITH SITUATIONS LIKE THE ONES MENTIONED IN GIVEN CASE STUDY PERTAINING TO RESOURCE MANAGEMENT

Source - Another student's paper Technology has been very helpful in dealing with situations like these, as mentioned in given case study pertaining to resource management

Suspected Entry: 81% match

Uploaded - Problem Set-12.docx AS MENTIONED ABOVE, THE RESERVATION SYSTEM WOULD HELP THE PROJECT MANAGERS TO EFFICIENTLY PLAN FOR THE PROJECT (PINTO, 2019)

Source - Another student's paper As mentioned above, the reservation system would help project manager efficiently plan for project

Suspected Entry: 95% match

Uploaded - Problem Set-12.docx IF ALL PROJECT MANGERS’ PLANS ARE HIGHLIGHTED UNDER ONE APPLICATION, IT WOULD SHOW ALL CONFLICTING ACTIVITIES OR RESOURCE ALLOCATION BEFOREHAND GIVING THE PROJECT MANAGER ENOUGH TIME TO NEGOTIATE OR LOOK OUT FOR ALTERNATIVES AND PROVIDE TIMELINE ESTIMATES ACCORDINGLY

Source - Another student's paper If all project manger’s plans are highlighted under one application, it would show all conflicting activities or resource allocation beforehand giving project manager enough time to negotiate or look out for alternatives or provide timeline estimates accordingly

Suspected Entry: 95% match

8/2/2020 SafeAssign Originality Report

https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_115684_1&paperId=3185157121&&att… 8/11

Uploaded - Problem Set-12.docx 4) WOULD TYLER’S SUGGESTION TO HIRE ADDITIONAL TECHNICIANS AND PURCHASE MORE EQUIPMENT SOLVE THE RESOURCE PROBLEMS AT SUNRISE

Source - Another student's paper Would Tyler's suggestion to hire additional technicians and purchase more equipment solve the resource problems at Sunrise

Suspected Entry: 100% match

Uploaded - Problem Set-12.docx WHY OR WHY NOT

Source - Another student's paper Why or why not

Suspected Entry: 100% match

Uploaded - Problem Set-12.docx TIME IS THE PROBLEM

Source - Another student's paper Time is the problem

Suspected Entry: 90% match

Uploaded - Problem Set-12.docx THAT BEING SAID, A SOLUTION SHOULD COME OUT DEALING WITH HOW THE EQUIPMENT WOULD BE EQUALLY AVAILABLE TO ALL PROJECT MANAGERS AND ON TIME

Source - Another student's paper Hence, a solution should come out dealing with how the equipment would be available equally to all project managers and on time

Suspected Entry: 85% match

Uploaded - Problem Set-12.docx AS RIGHTLY STATED, THE ISSUE HAS OCCURRED FOR JUST A SINGLE PROJECT MANAGER OUT OF MANY, HENCE IT CONSIDERED MORE SUBJECTIVE THAN OBJECTIVE

Source - Another student's paper As rightly stated, the issue has occurred for just one project manager out of many, so it is more subjective than objective

Suspected Entry: 79% match

Uploaded - Problem Set-12.docx THE PROJECT MANAGER NEEDS TO BE CO- OPERATIVE AND WORK THE WAY OTHER

Source - Another student's paper The project manager needs to be co-operative and work how other project managers would, who are not

8/2/2020 SafeAssign Originality Report

https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_115684_1&paperId=3185157121&&att… 9/11

PROJECT MANAGERS WOULD, THAT IS complaining

Suspected Entry: 87% match

Uploaded - Problem Set-12.docx IT MIGHT SOLVE HIS PROBLEM PERTAINING TO HIS PROJECT, BUT IT WILL CREATE PROBLEM FOR HIS OWNER ESPECIALLY ON THE IDLENESS OF EQUIPMENT

Source - Another student's paper It might solve his problem pertaining to his project, but it will create problem for his owner as rightly mentioned, idleness of equipment

Suspected Entry: 65% match

Uploaded - Problem Set-12.docx 08/02/2020

Source - Another student's paper (2020, July 02)

Suspected Entry: 84% match

Uploaded - Problem Set-12.docx 1) RESOURCE CONSTRAINTS FACING BY SUNRISE AND ITS PROJECT MANAGERS

Source - Another student's paper Resource constraints that Sunrise and its project managers are facing

Suspected Entry: 92% match

Uploaded - Problem Set-12.docx 2) IS SUNRISE’S CURRENT MODEL OF PRIORITIZING RESOURCE ASSIGNMENTS VIABLE

Source - Another student's paper Is Sunrise’s current model of prioritizing resource assignments viable

Suspected Entry: 100% match

Uploaded - Problem Set-12.docx ACHIEVING COMPETITIVE ADVANTAGE

Source - Another student's paper achieving competitive advantage

Suspected Entry: 67% match

Uploaded - Problem Set-12.docx Source - Another student's paper

8/2/2020 SafeAssign Originality Report

https://ucumberlands.blackboard.com/webapps/mdb-sa-BB5a31b16bb2c48/originalityReportPrint?course_id=_115684_1&paperId=3185157121&&a… 10/11

FOR INSTANCE, AS A RESULT OF THE REDUCED NUMBER OF EQUIPMENT, I THINK THAT TYLER WAS NOT ABLE TO GET THE EQUIPMENT THAT DELAYED HIS PART OF THE PROJECT FOR AROUND 3 DAYS WHILE THE EQUIPMENT WAS GETTING USED BY KEN

If we take the given example, due to the limited number of equipment, Tyler could not get the equipment that delayed his part of the project for 3- days while the equipment is in use by Ken

Suspected Entry: 81% match

Uploaded - Problem Set-12.docx THESE 3 DAYS OF IDLENESS NOT ONLY INCUR PROJECT TIME DELAY, BUT BOTH WORKERS AS WELL AS THE PROJECT MANAGERS ARE SUPPOSED TO BE PAID

Source - Another student's paper These 3 days of idleness not only incur project time delay, but workers need to be paid, project managers need to pay

Suspected Entry: 94% match

Uploaded - Problem Set-12.docx DESPITE THE FACT THAT NOT ALL PROJECT MANAGERS WOULD WANT THEIR PLANS TO BE DISCLOSED TO ONE ANOTHER, TECHNOLOGY CAN HELP KEEP THE REST OF THE PLAN HIDDEN FROM OTHER PROJECT MANAGERS AND ONLY HIGHLIGHT THE CONFLICTING PARTS

Source - Another student's paper Although not all project managers would want their plans to be disclosed to one another, technology can help keep the rest of the plan hidden from other project managers and only highlight the conflicting parts

Suspected Entry: 66% match

Uploaded - Problem Set-12.docx ADDING NEW EQUIPMENT WOULD INCREASE THE IDLE TIME WHICH WILL LATER CONSUME UP THE BUDGET FROM THE COMPANY, RENDERING IT NON EFFICIENT

Source - Another student's paper Adding new equipment would increase idle time and that idle time eats up the budget from the company, which no company wants and is not efficient

Suspected Entry: 74% match

Uploaded - Problem Set-12.docx TYLER’S SUGGESTIONS ARE BASED ON HIS CURRENT PROJECT, THUS, HIS SUGGESTIONS TO ADD TECHNICIANS AND PROCURE MORE EQUIPMENT IS NOT GOING TO SOLVE OVERALL PROBLEM

Source - Another student's paper Hence, his suggestions to add technicians and procure more equipment are not going to solve the overall problem