Project management
Please use these case instructions ( PSA Business Case Download PSA Business Case) for further details regarding the completion of the assignment (NOTE: Assume the initiative is starting in January with an implementation by the end of 2022). Additionally, you will need to use this Work Breakdown Structure ( WBS Download WBS) as a starting point. As a refresher, this podcast (Links to an external site.) will walk you through how to copy/paste/use auto numbering feature in ProjectPlan 365. The Assignment Deliverables are outlined below:
A. Project Schedule - Project Plan 365 ( Download instructions are in Module 2)
· NOTE: While not ideal, the FREE academic edition of PP365 will not allow sharing the schedule. Please collaborate/create the schedule in excel and then have 1 member cut/paste into PP365. The file CAN be saved/shared. Alternatively, you can create a virtual session with one member navigating/entering data.
B. RACI Matrix
C. Project Kickoff Deck
You may need to reference podcasts, labs, etc. included in previous weeks' modules. Additionally, you may need to do a bit of online research. Make sure to include a reference page if outside sources are used.