Space Launch Project

jredfearn
ProposedProjectModel-ProjectFileGradingRubric1.pdf

Criteria Ratings Points

Task List/Gantt Chart

70 to >63 pts

Advanced

The Project (or similar approved software) task list is well-developed, with a well-organized work breakdown structure reflected in the task list and appropriate dependencies and time estimates included. The Project includes: • Project start date with rationale. • At least 5 deliverables included. • At least 20–25 unique tasks included. • Hierarchy delineates deliverables and tasks. • Project coded in 1.1, 1.1.1, 1.2 format. • Duration (in days) for each task. • At least 3 milestones included. • All individual tasks and milestones linked. • At least 2 relationships are not Finish-to-Start. • At least 1 task includes lead or lag time, with rationale. • Over-allocation justified, if needed. • Project baseline set.

63 to >58 pts

Proficient

The Project (or similar approved software) task list is well-developed, with a work breakdown structure reflected in the task list and appropriate dependencies and time estimates included. The Project includes all or nearly all of the following: • Project start date with rationale. • At least 5 deliverables included. • At least 20–25 unique tasks included. • Hierarchy delineates deliverables and tasks. • Project coded in 1.1, 1.1.1, 1.2 format. • Duration (in days) for each task. • At least 3 milestones included. • All individual tasks and milestones linked. • At least 2 relationships are not Finish-to-Start. • At least 1 task includes lead or lag time, with rationale. • Over-allocation justified, if needed. • Project baseline set.

58 to >0 pts

Developing

The Project (or similar approved software) task list needs further development. The Project fails to include elements of the following: • Project start date with rationale. • At least 5 deliverables included. • At least 20–25 unique tasks included. • Hierarchy delineates deliverables and tasks. • Project coded in 1.1, 1.1.1, 1.2 format. • Duration (in days) for each task. • At least 3 milestones included. • All individual tasks and milestones linked. • At least 2 relationships are not Finish-to-Start. • At least 1 task includes lead or lag time, with rationale. • Over-allocation justified, if needed. • Project baseline set.

0 pts

Not Present

No Task List/Gantt Chart is included.

70 pts

Proposed Project Model: Project File Grading Rubric | BUSI681_D02_202320

Criteria Ratings Points

Resource Sheet

35 to >31 pts

Advanced

The Project (or similar approved software) resource sheet is well-developed, with all of the necessary resource requirements including: • At least 6 human resources entered on the Resource Sheet. • At least half of the resources include comments. • Labor costs included. • Resources assigned to every task.

31 to >28 pts

Proficient

The Project (or similar approved software) resource sheet is included, with nearly all of the necessary resource requirements including: • At least 6 human resources entered on the Resource Sheet. • At least half of the resources include comments. • Labor costs included. • Resources assigned to every task.

28 to >0 pts

Developing

The Project (or similar approved software) resource sheet is included but lacks some of the following elements: • At least 6 human resources entered on the Resource Sheet. • At least half of the resources include comments. • Labor costs included. • Resources assigned to every task.

0 pts

Not Present

No Resource Sheet is included.

35 pts

Grammar and Structure

45 to >40 pts

Advanced

The Project (or similar approved software) is saved according to the assignment parameters and is presented as a network diagram. All notes are appropriate for the project, are well-developed, and free from grammar errors. This includes: • Saved as LastName_Project_Name • Overall project is first task, with info in notes. • Justified time estimates for at least 5 tasks. • Project displayed as a network diagram.

40 to >37 pts

Proficient

The Project (or similar approved software) is saved but may not be in a network diagram. Overall the notes are appropriate for the project, are well-developed, and mostly free from grammar errors. This includes: • Saved as LastName_Project_Name • Overall project is first task, with info in notes. • Justified time estimates for at least 5 tasks. • Project displayed as a network diagram.

37 to >0 pts

Developing

The Project (or similar approved software) notes are not appropriate for the project and contain numerous grammar errors. Elements that may be missing include: • Saved as LastName_Project_Name • Overall project is first task, with info in notes. • Justified time estimates for at least 5 tasks. • Project displayed as a network diagram.

0 pts

Not Present

The Project is not submitted or lacks requirements and has numerous spelling, grammar, or punctuation errors are present.

45 pts

Total Points: 150

Proposed Project Model: Project File Grading Rubric | BUSI681_D02_202320