Control chart

Eva Chan
Projectclosureslidesv1.ppt

© 2012 International Institute for Learning, Inc.

DS – 624

Quality Management

© 2014 International Institute for Learning, Inc.

7-00-*

IIL-LSSGB

Learning objectives

  • Describe project closure best practices

Lean Six Sigma Green Belt

Introduction to Control

IIL-LSSGB

7-00-*

Roadmap – Control Phase

Define

Houston, we

have a problem

Measure

How bad is it?

Analyze

Find the

Root Cause

Improve

Fix it- Eliminate

Root Cause

Control

Make it

stay fixed

Control Plan

Control Charts

Project Close Out

Lean Six Sigma Green Belt

Introduction to Control

IIL-LSSGB

This roadmap shows the activities and tools of the Control phase. It is designed to give you a good overview of the main steps in Control.

7-00-*

Closing the Project

Lean Six Sigma Green Belt

7_TP-*

Transition Planning

IIL-LSSGB

Project Closure

Prepare your project report (tell the story and solve the mystery).

How can you acknowledge your team members for their contributions for the project?

How can you celebrate project success?

What lessons did you learn about the process? About working as a team? About the DMAIC process?

Lean Six Sigma Green Belt

Introduction to Control

IIL-LSSGB

7-00-*

Learning objectives

  • Describe project closure best practices

Lean Six Sigma Green Belt

Introduction to Control

IIL-LSSGB

7-00-*

© 2012 International Institute for Learning, Inc.

Thank you!

© 2014 International Institute for Learning, Inc.

7-00-*