Project Management: Program and Portfolio Information Systems course (written essay)

harik
PPMP20012LectureWeek3ready.pdf

PPMP 20012

Program & Portfolio Information Systems

Lecture 3 for Week 3

Dr. Ronny Veljanovski, BSc, PhD, GradCertTEd, CertIVFMB, PMP

Discipline Leader for Project Management,

School of Engineering & Technology

Higher Education Division

CQUniversity Melbourne

Topics

• Topic for the week is:

– “Assess the relevance of systems engineering to

project cases”

• Lecture

– Overview

– Tasks

– Week 3

2

Week 2 - Topic: Identify different systems thinking tools and techniques to

aid project managers solve project problems

• SEBoK http://www.sebokwiki.org

– Part 2: Foundations of Systems Engineering - 'Knowledge Area: Systems Fundamentals';

– Part 2: Foundations of Systems Engineering - 'Knowledge Area: Systems Science';

– Part 2: Foundations of Systems Engineering - 'Knowledge Area: Systems Thinking';

– Part 2: Foundations of Systems Engineering - 'Knowledge Area: Representing Systems with

Models';

– Part 6: Related Disciplines - 'Knowledge Area: Systems Engineering and Industrial

Engineering';

– Part 6: Related Disciplines - 'Knowledge Area: Systems Engineering and Specialty

Engineering';

– Part 7: Systems Engineering Implementation Examples: How Lack of Information Sharing

Jeopardized the NASA/ESA Cassini/Huygens Mission to Saturn;

– Part 7: Systems Engineering Implementation Examples: Project Management Case Study;

• Kerzner (2013) Chapters 17.12-17.17;

• AS/NZS 15288:2015 Chapter 5;

3

PPMP20012

Program & Portfolio Information Systems

THE 3RD WEEK’S READINGS

SEBoK Readings – Foundations of System Engineering

• Part 2: Foundations of Systems Engineering - 'Knowledge Area: Systems

Fundamentals';

• Part 2: Foundations of Systems Engineering - 'Knowledge Area: Systems Science';

• Part 2: Foundations of Systems Engineering - 'Knowledge Area: Systems Thinking';

• Part 2: Foundations of Systems Engineering - 'Knowledge Area: Representing

Systems with Models';

• Part 6: Related Disciplines - 'Knowledge Area: Systems Engineering and Industrial

Engineering';

• Part 6: Related Disciplines - 'Knowledge Area: Systems Engineering and Specialty

Engineering';

• Part 7: Systems Engineering Implementation Examples: How Lack of Information

Sharing Jeopardized the NASA/ESA Cassini/Huygens Mission to Saturn;

• Part 7: Systems Engineering Implementation Examples: Project Management Case

Study;

SEBoK – Part 2 - What is a System?

SEBoK – Part 2 - What is a System? • System classifications, e.g:

– Structures

– Controls

– Humans

– Social, e.g. families

• Engineered Systems Classifications

– Created, used and sustained to achieve a purpose, mission, goal

– Driven by stakeholders

– Hardware, software, human, services etc

– Have a life cycle

• Enterprise and Enterprise Systems

• Products and Product Systems

• Services and Service Systems

• Systems of Systems & Capability

– A system contains elements which can be considered independent (systems)

– The combination of enterprise, service and product systems provide a capability

greater than any individual enterprise

SEBoK – Part 2 – System Complexity

• Structural Complexity – Looks at the system elements and relationships.

– How many different ways system elements can be combined?

– Can the system adapt to external needs?

• Dynamic Complexity – Considers the complexity which can be observed when systems are used to perform

particular tasks in an environment

– The ways in which systems interact in the short term is directly related to system behaviour

– The longer term effects of using systems in an environment is related to system evolution

• Socio-political Complexity – The effect of individuals or groups of people on complexity.

– People-related complexity:

• Multiple stakeholder viewpoints, social or cultural biases add to the wider influences on a system

context

• Irrational behaviour of an individual or the swarm behaviour, unpredicted and can be counterproductive

• Relationships and interactions of people

SEBoK – Part 2 – Systems Science

SEBoK – Part 2 – Systems Thinking

SEBoK – Part 2 – Concepts of Systems Thinking

• Wholeness and Interaction

• Regularity

• State and Behaviour

• Survival Behaviour

• Goal Seeking Behaviour

• Control Behaviour

• Function

• Hierarchy, Emergence and Complexity

• Effectiveness, Adaptation and Learning

SEBoK – Part 2 – Representing Systems with models

• What is a model? (some definitions in SEBoK):

– a physical, mathematical, or otherwise logical representation of a

system, entity, phenomenon, or process (DoD 1998);

– a representation of one or more concepts that may be realised in

the physical world (Friedenthal, Moore, and Steiner 2009);

– a simplified representation of a system at some particular point

in time or space intended to promote understanding of the real

system (Bellinger 2004);

– an abstraction of a system, aimed at understanding,

communicating, explaining, or designing aspects of interest of

that system (Dori 2002);

SEBoK – Part 2 – Representing Systems with models

• The modelling of systems and simulations during the

early stages of the system design of complex systems

and architectures can:

– document system functions and requirements

– assess the mission performance

– estimate costs

– evaluate trade-offs

– provide insights to improve performance, reduce risk, and

manage costs

• Modelling serves to make concepts concrete and formal,

enhance quality, productivity, documentation, and

innovation, as well as to reduce the cost and risk of

systems development

SEBoK – Part 2 – Representing Systems with models

• Modelling examples

– Integrated Circuit Simulation (e.g. microchip)

– 3D computer aided models for mechanical engineering (e.g.

Engine)

– Software design and architecture models (e.g. app development)

– Flight simulation for pilot training

• Modelling can complement actual testing and verification

• Organisations can use models and simulations to obtain

greater predictability of their projects and programs as

well as model alternatives

SEBoK – Part 2 – Representing Systems with models

SEBoK – Part 7 Case Studies (read)

• Complex Adaptive Project Management

– http://sebokwiki.org/wiki/Complex_Adaptive_Project_

Management_System_Case_Study

• NASA’s mission to Saturn

– http://sebokwiki.org/wiki/How_Lack_of_Information_S

haring_Jeopardized_the_NASA/ESA_Cassini/Huygen

s_Mission_to_Saturn

AS/NZS 15288:2015

• Chapter 5 – Key Concepts and application of this International Standard

– 5.1 Introduction

– 5.2 System Concepts

– 5.3 Organisation and Project Concepts

– 5.4 Life Cycle Concepts

– 5.5 Process Concepts

– 5.6 Processes in this standard

– 5.7 Process Application

– 5.8 Process reference model

15288:2015 - 5.2 System Concepts

• Systems: man-made, created and utilised to provide products or services in defined environments for the benefit of users and other stakeholders – Hardware

– Software

– Data

– Humans

– Processes

– Procedures

– Facilities

– Materials

– Etc.

Source: ANZ/NZS ISO/IEC/IEEE 15288:2015

15288:2015 - 5.2 System Concepts

• A stakeholder’s system-of-interest can be a system element in another stakeholder’s system-of-interest – defined boundaries encapsulate meaningful needs and practical

solutions;

– there is a hierarchical or other relationship between system elements;

– an entity at any level in the system-of-interest can be viewed as a system;

– a system comprises an integrated, defined set of subordinate system elements;

– humans can be viewed as both users external to a system and as system elements (i.e., operators) within a system;

– a system can be viewed in isolation as an entity, i.e. a product; or as a collection of functions capable of interacting with its surrounding environment, i.e., a set of services.

Source: ANZ/NZS ISO/IEC/IEEE 15288:2015

15288:2015 - 5.2 System Concepts

Source: ANZ/NZS ISO/IEC/IEEE 15288:2015

15288:2015 - 5.2 System Concepts

Source: ANZ/NZS ISO/IEC/IEEE 15288:2015

15288:2015 - 5.2 System Concepts S

o u rc

e : A

N Z

/N Z

S IS

O /IE

C /IE

E E

1 5 2 8 8 :2

0 1 5

15288:2015 - 5.6 Processes in this standard

Source: ANZ/NZS ISO/IEC/IEEE 15288:2015

Systems and PPPM

• Why should organisations think in terms of

systems?

• How is it relevant to PPPM?

Kerzner (2013): 17.12 – 17.17

• Chapter 17 – Risk Management

17.1 – Plan Risk Responses

17.13 – Monitor & Control Risks

17.17 – The Impact of Risk Handling Measures

Future Risks

Customer’s Knowledge

Experienced

Inexperienced

Simple Complex

Contract Type

Source: Kerzner 2013

How Much Risk Is Acceptable?

• High tolerance for risk

• Medium tolerance for risk

• Low tolerance for risk

Source: Kerzner 2013

R&D

Manufacturing

Marketing

Time

Low Risk

Degrees of Downstream Risk

Source: Kerzner 2013

R&D

Manufacturing

Marketing

Information Exchange

Time

Moderate Risk

Degrees of Downstream Risk

Source: Kerzner 2013

R&D

Manufacturing

Marketing

Time

High Risk

Degrees of Downstream Risk

Source: Kerzner 2013

Prioritization of Risks

Schedule Cost Technical

Performance or Quality

First (Highest) Priority

Second Priority

Third Priority

Source: Kerzner 2013

Risk Controls S

c h

e d

u le

L e n

g th

Risk Controls

Appropriate

Too Long

Low High

Too Many Risk Management

Filters and Gates

No Risk Plan

Source: Kerzner 2013

Risk Control Measures In

te n

s it

y o

f C

o n

tr o

ls

Risk Intensity

Standard Controls

High

Range of Controls

Low

Low

Extreme

Source: Kerzner 2013

P ro

je c t

P ro

c e d

u ra

l D

o c u

m e n

ta ti

o n

Guidelines High Low

Tolerance for Risk

Rigid Policies/

Procedures

Assumption

Reduction

Transfer

Avoidance

Which Method to Use?

Source: Kerzner 2013

The Risk-Reward Matrix

Low High

Reward

Medium

Risk

High

Low

Medium

Source: Kerzner 2013

Specification Limit On Characteristic B

Interacting Risks

P ro

d u

c t

F e a tu

re A

Product Feature B

Desirable

Undesirable

Undesirable Desirable

Source: Kerzner 2013

Poor Risk Management

Risk Planning

Technical Inability

P e rf

o rm

a n

c e

Time Source: Kerzner 2013

Week 3 - Topic: Assess the relevance of systems

engineering to project cases.

• Reflection:

– What is systems engineering?

– Why would an organisation use systems engineering?

– Who in an organisation would use systems engineering?

– What is the relevance to project management?

– What is the relevance to portfolio management?

– What is the relevance to the project cases?

– Is there anything that will explain these reflections using

the Project-based Work Flow?

• How will you write these reflections in the Portfolio

for Week 3?

38

Summary

• Topic for the week is:

– “Assess the relevance of systems engineering to

project cases”

• Lecture

– Overview

– Tasks

– Week 3

39

SEBoK – Part 7 Case Studies (read)

• Complex Adaptive Project Management

– http://sebokwiki.org/wiki/Complex_Adaptive_Project_

Management_System_Case_Study

• NASA’s mission to Saturn

– http://sebokwiki.org/wiki/How_Lack_of_Information_S

haring_Jeopardized_the_NASA/ESA_Cassini/Huygen

s_Mission_to_Saturn