English presentation 3-5 mins

cSu
PoetryTermsProject.docx

Name:______________________________ Date ____________ Period _______

Poetry Terms Project

You will be given a literary term for which you will become the expert. Your task will be to teach the class about the term by providing the definition, examples, and importance of the term. You must create a google slides presentation which you will use to teach the class about your term.

For your slides you must have:

1. A title slide with the name of the term being the largest font on your slide

2. A slide with the definition of the element

3. Multiple slides with examples of the term in poetry or literature. (at least three)

4. A picture that you feel represents the element of literature, either as a background or as a separate picture.

5. The importance of the term in literature. You can use the following website to help with this: https://literaryterms.net/

Your slides must be easy to read, aesthetically pleasing, and accurately portraying your element of poetry. Your presentations will be no longer than 3-5 minutes.

Rubric for Literary Devices Slides

Correct definition and use of examples 1 2 3 4 5

Creative use of art and appealing design 1 2 3 4 5

Overall effectiveness and requirements 1 2 3 4 5

teaching

Effective Communication 1 2 3 4 5

Total /20 Points