Solve Using Exel- Assignments- Formulas

Mark3433
Module3ProblemWorkbook.xlsx

P4-46

Police force scheduling
Starting 4 hours of 8-hour shift
M-4A 4A-8A 8A-N N-4P 4P-8P 8P-M
Number starting
Number available each 4-hour period
Number required
Total employed

Problem 3.2

P4-48

Producing drugs
Cost/lb of chemicals
Chemical 1
Chemical 2
Chemical 3
Chemical 4
Ingredient/lb of chemical
A B C
Chemical 1
Chemical 2
Chemical 3
Chemical 4
Required percentages of ingredients
A B C
Production plan
Lbs used Required
Chemical 1
Chemical 2
Chemical 3
Chemical 4
Total
Percentage constraints (expressed in lbs)
A B C
Actual
Required
Cost

Problem 3.5

P4-50

Selling oranges and orange juice
Revenues, variable costs
Juice Bags
Revenue
Variable cost
Grades used to make juice and bags
Grade Juice Bags Used Available
Sold
Required average quality
Juice Bags
Quality constraints
Juice Bags
Actual
Required
Total variable cost
Total revenue
Profit

Problem 3.7