Group Assignment #3: Project Schedule (10%)

General notes:

· Include a covering table in your submission that clarifies who worked on which part(s) of the assignment. (optional)

· Each team needs to submit only one set of documents using Turn-it-in application (in PM Software extension)

· Name the files in this format: Section # xx Group x. abc

Prepare and submit Project Schedule

Using one of the common Project Management softwares ( preferably Project Libre/Primavera P6 ), build the project schedule (Gantt Chart and Network Diagram) for your Assignment #1 project.

Important Notes:

· Make sure you mention your project assumptions and limitations such as time constraints and resource constraints (People/material/equipments) in a separate MS Word/ pdf document separately

· Adjust your schedule to reflect your constraints and limitations.

· Build a resource table and assign resources to tasks.

· Balance your resources levels. (Include screenshots of before and after adjusting your resource level)

· Address milestones identified in Assignment #1.

· Include the lag times.

· Make sure your schedule is in-line with what you have submitted for your Assignments #1