Project management 3
Group Assignment #3: Project Schedule (10%)
General notes:
· Include a covering table in your submission that clarifies who worked on which part(s) of the assignment. (optional)
· Each team needs to submit only one set of documents using Turn-it-in application (in PM Software extension)
· Name the files in this format: Section # xx Group x. abc
Prepare and submit Project Schedule
Using one of the common Project Management softwares ( preferably Project Libre/Primavera P6 ), build the project schedule (Gantt Chart and Network Diagram) for your Assignment #1 project.
Important Notes:
· Make sure you mention your project assumptions and limitations such as time constraints and resource constraints (People/material/equipments) in a separate MS Word/ pdf document separately
· Adjust your schedule to reflect your constraints and limitations.
· Build a resource table and assign resources to tasks.
· Balance your resources levels. (Include screenshots of before and after adjusting your resource level)
· Address milestones identified in Assignment #1.
· Include the lag times.
· Make sure your schedule is in-line with what you have submitted for your Assignments #1