1.0
2.0:
Product Research
· Task 1: Find similar designs
1. Members Responsible: everyone
2. Objective: To find current technology on the market
3. Deliverables: A literature survey
4. Required Resources: A computer for research
5. Schedule/Cost Estimate: February 1-February 7. No cost
· Task 2: Find potential competition
1. Members Responsible: everyone
2. Objective: To find existing products with the same application
3. Deliverables: Links to the products
4. Required Resources: A computer for research
5. Schedule/Cost Estimate: February 7-February 14. No cost
Product Planning
· Task 1: Anticipate manufacturing requirements
1. Members Responsible: Devontay, Mohanned
2. Objective: To consider future costs, personnel, and equipment needed
3. Deliverables: A few paragraphs
4. Required Resources: A computer for research
5. Schedule/Cost Estimate: February 14-February 21. No cost
· Task 2: Find customer requirements
1. Members Responsible: everyone
2. Objective: To find the needs of the customer
3. Deliverables: Survey results
4. Required Resources: survey, and potential customers
5. Schedule/Cost Estimate: February 21-February 28. No cost
Product Development
· Task 1: Design product
1. Members Responsible: Noah, Dakota
2. Objective: To brainstorm and develop ideas for the product
3. Deliverables: Sketches and a decision on how the product will work
4. Required Resources: A computer
5. Schedule/Cost Estimate: February 28-March 7. No cost
· Task 2: Create models and drawings for components
1. Members Responsible: Devontay, Mohanned
2. Objective: To create the components and drawings
3. Deliverables: Models and prints
4. Required Resources: computer with modeling capabilities
5. Schedule/Cost Estimate: March 7-March 14. No cost
Testing and Validation
· Task 1: Analyze stresses in ANSYS
1. Members Responsible: Adam, Noah
2. Objective: To anticipate potential failure in our product
3. Deliverables: Stress and deformation results
4. Required Resources: A computer with ANSYS
5. Schedule/Cost Estimate: March 14-March 21. No cost
· Task 2: Create Prototype
1. Members Responsible: Dakota
2. Objective: To create and test a prototype
3. Deliverables: prototype
4. Required Resources: 3D printer, and metal spring
5. Schedule/Cost Estimate: March 21-March 28. Cost-printing material ($2)
Product Development
· Task 1: Find a manufacturer (molds and assembly process)
1. Members Responsible: everyone
2. Objective: To find a manufacturer to create our product
3. Deliverables: a manufacturer report
4. Required Resources: A computer, and connections
5. Schedule/Cost Estimate: undetermined. Cost-?
· Task 2: Develop marketing plan and sell product
1. Members Responsible: everyone
2. Objective: To finalize the product into the market
3. Deliverables: finished product
4. Required Resources: manufacturing process and potential sellers
5. Schedule/Cost Estimate: undetermined. Cost-?
|
Product Research |
|
|
Proposed Product Name: Reel Quik |
|
|
|
Name of Task: Find Similar Design |
|
|
Objective : To find similar technology on the market |
|
|
Deliverables: Literature survey |
|
|
Decisions needed: Decision 2: Create literature survey |
|
|
Personnel needed Title: Researcher Hours: 3 Percent full time: Title: Researcher Hours: 3 Percent full time: |
|
|
Time estimate Total hours: 6 Lapsed time(include units): |
|
|
Sequence: Predecessors: Successors: Find Potential Competition Start Date: 2/1/18 Finish Date: 2/7/18 |
|
|
Costs: Capital Equipment N/A Disposables: N/A |
|
|
Name of Task: Find Potential Competition |
|
|
Objective : To find existing products with the same application |
|
|
Deliverables: Links to the products |
|
|
Decisions needed: Decision 1: Determine whether product is in the same application Decision 2: |
|
|
Personnel needed Title: Researcher Hours: 3 Percent full time: Title: Researcher Hours: 3 Percent full time: |
|
|
Time estimate Total hours: 6 Lapsed time(include units): |
|
|
Sequence: Predecessors: Successors: Start Date: 2/7/18 Finish Date: 2/14/18 |
|
|
Costs: Capital Equipment Disposables: |
|
| |
|
Team member: Dakota
| |
|
Team member: Adam
| |
|
Team member: Devontay, Mohanned
|
|
|
The Mechanical Design Process Designed by Professor David G. Ullman Copyright 2008, McGraw Hill Form # 10.0 |
|
Product Planning |
|
|
Design Organization: Group 5 |
Date: 2/25/18 |
|
Proposed Product Name: Reel Quik |
|
|
Task 1
|
Name of Task: Anticipate Manufacturing Requirements |
|
|
Objective : To consider future costs, personnel, and equipment needed |
|
|
Deliverables: A few paragraphs
|
|
|
Decisions needed: Decision 1: Determine manufacturing possibilities Decision 2: |
|
|
Personnel needed Title: Designer Hours: 3 Percent full time: Title: Hours: Percent full time: |
|
|
Time estimate Total hours: 3 Lapsed time(include units): |
|
|
Sequence: Predecessors: Successors: Start Date: 2/14/18 Finish Date: 2/21/18 |
|
|
Costs: Capital Equipment N/A Disposables: N/A |
|
Task 2
|
Name of Task: Find Customer Requirements |
|
|
Objective : To find the needs of the customer |
|
|
Deliverables: Survey results
|
|
|
Decisions needed: Decision 1: Determine how to meet the customer needs Decision 2: |
|
|
Personnel needed Title: Surveyor Hours: 5 Percent full time: Title: Surveyor Hours: 5 Percent full time: |
|
|
Time estimate Total hours: 10 Lapsed time(include units): |
|
|
Sequence: Predecessors: Find potential competition Successors: product development Start Date: 2/21/18 Finish Date: 2/28/18 |
|
|
Costs: Capital Equipment Disposables: |
|
Team member: Noah
|
Prepared by: Noah |
|
Team member: Dakota
|
Checked by: Dakota |
|
Team member: Adam
|
Approved by: Noah |
|
Team member: Devontay, Mohanned
|
|
|
The Mechanical Design Process Designed by Professor David G. Ullman Copyright 2008, McGraw Hill Form # 10.0 |
|
Product Development |
|
|
Design Organization: Group 5 |
Date: 2/25/18 |
|
Proposed Product Name: Reel Quik |
|
|
Task 1
|
Name of Task: Design Product |
|
|
Objective : To brainstorm and develop ideas for the product |
|
|
Deliverables: sketches
|
|
|
Decisions needed: Decision 1: Determine how the product will work Decision 2: |
|
|
Personnel needed Title: Designer Hours: 4 Percent full time: Title: Designer Hours: 4 Percent full time: |
|
|
Time estimate Total hours: 8 Lapsed time(include units): |
|
|
Sequence: Predecessors: customer survey Successors: create models and drawings for components Start Date: 2/28/18 Finish Date: 3/7/18 |
|
|
Costs: Capital Equipment N/A Disposables: N/A |
|
Task 2
|
Name of Task: Create models and drawings for components |
|
|
Objective : To create the components and drawings |
|
|
Deliverables: Models and Prints
|
|
|
Decisions needed: Decision 1: Determine if design incorporates customer needs and will work Decision 2: |
|
|
Personnel needed Title: Designer Hours: 4 Percent full time: Title: Designer Hours: 4 Percent full time: |
|
|
Time estimate Total hours: 8 Lapsed time(include units): |
|
|
Sequence: Predecessors: Determine how product will work Successors: Start Date: 3/7/18 Finish Date: 3/14/18 |
|
|
Costs: Capital Equipment Disposables: |
|
Team member: Noah
|
Prepared by: Noah |
|
Team member: Dakota
|
Checked by: Dakota |
|
Team member: Adam
|
Approved by: Noah |
|
Team member: Devontay, Mohanned
|
|
|
The Mechanical Design Process Designed by Professor David G. Ullman Copyright 2008, McGraw Hill Form # 10.0 |
|
Testing and Validation |
|
|
Design Organization: Group 5 |
Date: 2/25/18 |
|
Proposed Product Name: Reel Quik |
|
|
Task 1
|
Name of Task: Analyze stresses in ANSYS |
|
|
Objective : To anticipate future failures in our prodcut |
|
|
Deliverables: stress and deformation results
|
|
|
Decisions needed: Decision 1: Determine what loads to apply Decision 2: |
|
|
Personnel needed Title: Designer Hours: 3 Percent full time: Title: Designer Hours: 3 Percent full time: |
|
|
Time estimate Total hours: 6 Lapsed time(include units): |
|
|
Sequence: Predecessors: Create models and Drawings Successors: Create a prototype Start Date: 3/14/18 Finish Date: 3/21/18 |
|
|
Costs: Capital Equipment N/A Disposables: N/A |
|
Task 2
|
Name of Task: Create Prototype |
|
|
Objective : To create and test a prototype |
|
|
Deliverables: prototype
|
|
|
Decisions needed: Decision 1: Determine if the design works as expected Decision 2: |
|
|
Personnel needed Title: Designer Hours: 3 Percent full time: Title: Hours: Percent full time: |
|
|
Time estimate Total hours: 3 Lapsed time(include units): |
|
|
Sequence: Predecessors: Analyze stresses in ANSYS Successors: Start Date: 3/7/18 Finish Date: 3/14/18 |
|
|
Costs: Capital Equipment 3D printer Disposables: |
|
Team member: Noah
|
Prepared by: Noah |
|
Team member: Dakota
|
Checked by: Dakota |
|
Team member: Adam
|
Approved by: Noah |
|
Team member: Devontay, Mohanned
|
|
|
The Mechanical Design Process Designed by Professor David G. Ullman Copyright 2008, McGraw Hill Form # 10.0 |
|
Product Development |
|
|
Design Organization: Group 5 |
Date: 2/25/18 |
|
Proposed Product Name: Reel Quik |
|
|
Task 1
|
Name of Task: Find a manufacturer (mold and assembly process) |
|
|
Objective : To find a manufacturer to create our product |
|
|
Deliverables: A manufacturer report
|
|
|
Decisions needed: Decision 1: Determine exactly what our process requires Decision 2: |
|
|
Personnel needed Title: Designer Hours: 40 Percent full time: Title: Designer Hours: 40 Percent full time: |
|
|
Time estimate Total hours: 3 Lapsed time(include units): |
|
|
Sequence: Predecessors: Anticipate Manufacutring needs Successors: Determine where to sell product Start Date: Unsure Finish Date: Unsure |
|
|
Costs: Capital Equipment N/A Disposables: N/A |
|
Task 2
|
Name of Task: Develop marketing plan and sell product |
|
|
Objective : To finalize the product into the market |
|
|
Deliverables: finished product
|
|
|
Decisions needed: Decision 1: Determine where to sell the product Decision 2: |
|
|
Personnel needed Title: Marketing Agent Hours: 40 Percent full time: Title: Hours: Percent full time: |
|
|
Time estimate Total hours: 3 Lapsed time(include units): |
|
|
Sequence: Predecessors: find a manufacturer Successors: Start Date: Unsure Finish Date: Unsure |
|
|
Costs: Capital Equipment Disposables: |
|
Team member: Noah
|
Prepared by: Noah |
|
Team member: Dakota
|
Checked by: Dakota |
|
Team member: Adam
|
Approved by: Noah |
|
Team member: Devontay, Mohanned
|
|
|
The Mechanical Design Process Designed by Professor David G. Ullman Copyright 2008, McGraw Hill Form # 10.0 |
4.0
a.
b.
Product Planning Task 1 = = = 3 hours
References