Introducing an Index Explain if any fabric was sub-contracted

Two parameters: Time, Cost

Sub-contract does not consider timing.

Time consumed = Demand * Hrs./Yd.

Cost difference = Demand * (Sub. Cost – Mill Cost)

Index = Cost difference/Time consumed (dollar per hour)

Meaning: Added cost per hour for the sub-contracted

4

Ranking of Index

5

Experiment

6

7

If anything other than fabric 1-4 was done by dobbie, why was dobbie used for it

Fabric 10 also produced by dobbie

Randomicity of excel

(fabric other than 1-4 and 6 could also be produced by dobbie)

Only factor of this model is cost

Sub-contracted only fabric 6, so the cost would be fixed.

The allocation of producing other fabric will not affect cost.

8

Any other thoughts on this model

Quality standard on different fabric

Economic of scale

……………………