Cage’s Coffee House Construction
*
Construction
1. Foundation
2. External
3. Internal
- 1. Foundation
1.1. Site Clearing
1.1.1 Levelling
1.2. Building demolition
1.3. Construction site setup
1.4. Excavate
1.4.1. Pour Concrete
1.4.2. Cure and Strip forms
1.5. Steel Erection
1.6. Inspection
*
2. External
2.1. Masonry Work
2.1.1. Lay masonry
2.1.2. Install roof drains
2.1.3. Install Tile in toilet rooms
2.1.4. Roofing
2.2. Building Finishes
2.2.1. Paint Walls
2.2.2. Ceiling tile
2.2.3. Hang Wallpaper
2.2.4. Furniture
2.2.5. Hardware appliances
2.3. Inspection
*
3. Internal
3.1. Electrical
3.1.1. Rough-in electrical
3.1.2. Install and terminate
3.1.3. Renewable Battery support
3.1.4. HVAC equipment
3.1.5. Fluorescent lighting
3.2. Hardware + Software
3.2.1. Motion detectors
3.2.2. Thermo-detectors
3.2.3. Espresso Machine
3.2.4 Espresso Grinder
3.2.5 Coffee Brewers
3.2.6 Decanters
3.2.7 Frappe and Smoothie Blenders
3.2.8 Iced Tea Brewers and Iced Tea Dispensers
3.2.9 Hot Water Dispenser.
3.2.10 Internet connection Wi-FI
3.3. Plumbing
3.4. Inspection
*
3.3. Plumbing
3.3.1. Rough-in plumbing
3.3.2. Set plumbing fixtures and trim
3.3.3. Test and clean
*