Long - term Problem A:

This problem involves building an earth dam using 22,000, 000 cubic yards of clay and 4,000,000 cubic yards of clean all compacted to 95% of maximum density based on ASTM D698. The sand and clay are placed in separate sections of  the natural ground level. Below ground level 30 feet of wet sand needs to be removed and replaced with compacted clay to a depth of 30 feet with an excavation width averaging 100 feet. The clay will obtained three miles from the project at an elevation 100 feet below the project site that is only accessed using a dirt road. The clay is very hard.The sand is available paved road, 17 miles away, 300 feet below the project site.  The project needs to be completed in 800 days. Determine the amount and types of equipment you feel should be used on this project.    

Long - term Problem B:

This problem involves building a steel frame high rise office building with three levels below ground(30 feet below ground). The building is 40 stories high and is located in the center of a city. The soil conditions involve soft clay to a depth of 120 feet with a water table at 20 feet. The project needs to be completed in 800 days. Determine the amount and types of equipment you feel should be used on this project.

Long - term Problem C:

The Problem involves building a 12 – foot diameter sewer at a bottom depth of 40 feet in loose sand with a water table at a depth of 8 feet. The alignment is along city streets. The project needs to be completed in 800 days. Determine the amount and types of equipment you feel should be used on this project. The sewer is ten miles in length.

Long – Term Problem D

The involves building a 80 highX80X100 reinforced concrete structure twenty feet below river bottom in soft clay. Water depth at the location is 30 feet. The structure is 200 feet from the river edge. The project needs to be completed in 800 days. Determine the amount and types of equipment you feel should be used on this project

Long

-

term Problem A:

This problem involves building an earth dam using 22,000, 000 cubic yards of clay and 4,00

0,000 cubic

yards of clean all compacted to 95% of maximum density based on ASTM D698. The sand and clay are

placed in separate sections of

the natural ground level. Below ground level 30 feet of wet sand needs to

be removed and replaced with compacted cl

ay

to a depth of 30 feet with an excavation width averaging

100 feet. The clay will obtained three miles from the project at an elevation 100 feet below the project

site that is only accessed using a dirt road. The clay is very hard.The sand is available p

aved road, 17

miles away, 300 feet below the project site.

The project needs to be completed in 800 days. Determine

the amount and types of equipment you feel should be used on this project.

Long

-

term Problem B

:

This problem involves building a steel frame high rise office building with three levels below ground(30

feet below ground). The building is 40 stories high and is located in the center of a city. The soil

conditions involve soft clay

to a depth of 120 feet with a water table at 20 feet. The project needs to be

completed in 800 days. Determine the amount and types of equipment you feel should be used on this

project.

Long

-

term Problem C:

The Problem involves building a 12

foot diameter sewer at a bottom depth of 40 feet in lo

ose sand

with a water table at a depth of 8 feet. The alignment is along city streets. The project needs to be

completed in 800 days. Determine the amount and types of equipment you feel should be used on this

project. The sewer is ten miles in length.

Lon

g

Te

rm

Probl

em D

The involves building a 80 highX80X100 reinforced concrete structure twenty feet below river bottom in

soft clay. Water depth at the location is 30 feet. The structure is 200 feet from the river edge. The

proje

ct needs to be completed in 800 days. Determine the amount and types of equipment you feel

should be used on this project

Long - term Problem A:

This problem involves building an earth dam using 22,000, 000 cubic yards of clay and 4,000,000 cubic

yards of clean all compacted to 95% of maximum density based on ASTM D698. The sand and clay are

placed in separate sections of the natural ground level. Below ground level 30 feet of wet sand needs to

be removed and replaced with compacted clay to a depth of 30 feet with an excavation width averaging

100 feet. The clay will obtained three miles from the project at an elevation 100 feet below the project

site that is only accessed using a dirt road. The clay is very hard.The sand is available paved road, 17

miles away, 300 feet below the project site. The project needs to be completed in 800 days. Determine

the amount and types of equipment you feel should be used on this project.

Long - term Problem B:

This problem involves building a steel frame high rise office building with three levels below ground(30

feet below ground). The building is 40 stories high and is located in the center of a city. The soil

conditions involve soft clay to a depth of 120 feet with a water table at 20 feet. The project needs to be

completed in 800 days. Determine the amount and types of equipment you feel should be used on this

project.

Long - term Problem C:

The Problem involves building a 12 – foot diameter sewer at a bottom depth of 40 feet in loose sand

with a water table at a depth of 8 feet. The alignment is along city streets. The project needs to be

completed in 800 days. Determine the amount and types of equipment you feel should be used on this

project. The sewer is ten miles in length.

Long – Term Problem D

The involves building a 80 highX80X100 reinforced concrete structure twenty feet below river bottom in

soft clay. Water depth at the location is 30 feet. The structure is 200 feet from the river edge. The

project needs to be completed in 800 days. Determine the amount and types of equipment you feel

should be used on this project