I need a assignment redone for my wk 9 for my Operational Excellence class

Bru8011w
assignment1550OperationalExcellence.pdf

Name

Date

LT 30 mins LT 60 mins LT

PT 180 mins PT 360 mins PT

%C&A 90% %C&A 90% %C&A

LT: 30 LT: 60 LT:

PT: 180 PT: 360 PT:

Overview of the Process

Challenges

Bottlenecks

References

Martin, K. & Osterling, M. (2014). Value Stream Mapping.

Standard Work Instructions:

Vanessa Woodard

11/7/2022

Customer

1. Insert your name, title of the value stream, and

demand or Takt time.

2. Insert the activity, role, number of staff, LT, PT,

and %C&A in the process blocks. The summary

timeline should autopopulate.

3. Verify the current state summary metrics are

calculated correctly.

4. Add the current state overview, challenges, and

bottleneck. Include any other relevant metrics (i.e.,

NPS, AHT, etc.).

5. Review the assignment instructions once more.

Check your work. Upload and submit when ready.

Review & Update First Draft editing QC Supplier Material

JK makes an order for two hundred units of books from Skyworth Design House. These Units are sibdivided into book 1, book 2, book 3, book 4, book 5 and book 6. Skyworth design house has 25 units in store and will therefore seek the processes of SDF supplier who is the prinitng house well as the graphic designer. Skyworth will review and update each of the books which will take approximately three hours to do so. these reviews have to be drafted and will consume six hours to do so. This will be followed by a supplier material requisition that will take six hours. Generally the whole process will take 1230 minutes which is approximately twenty one working hours. The client will get their order in the fourth day

there may be issues in reviewing and getting the feedback to the print house

there are delays in the print house which may cause delays in the operations.

a minor error in one book may cause the design house to recheck all other components.

the client needs the units as fast as possible

Reviewing and updating

books needs two persons

and each books requires

First draft editing

requires two persons

each taking one hour for

Quanity supplied

material requires one

person who will consume

Title:

Demand or Takt time:

60 mins LT 30 mins LT 10 mins LT 5

360 mins PT 180 mins PT 60 mins PT 30

96% %C&A 70% %C&A 100% %C&A 95%

60 LT: 30 LT: 10 LT: 5

360 PT: 180 PT: 60 PT: 30

Skyworth Design Value Stream

A customer needs 6 books which will take 1230 hours to produce and deliver

Customer

Print ProofsQC Supplier Material Final Approval

Production Control

Proof Approval

the books have to be

apprived for printing

purposes. It will take one

JK makes an order for two hundred units of books from Skyworth Design House. These Units are sibdivided into book 1, book 2, book 3, book 4, book 5 and book 6. Skyworth design house has 25 units in store and will therefore seek the processes of SDF supplier who is the prinitng house well as the graphic designer. Skyworth will review and update each of the books which will take approximately three hours to do so. these reviews have to be drafted and will consume six hours to do so. This will be followed by a supplier material requisition that will take six hours. Generally the whole process will take 1230 minutes which is approximately twenty one working hours. The client will get their order in the fourth day

there may be issues in reviewing and getting the feedback to the print house

there are delays in the print house which may cause delays in the operations.

a minor error in one book may cause the design house to recheck all other components.

the client needs the units as fast as possible

Quanity supplied

material requires one

person who will consume

Final Approval is done by

one person and will take

thirty minutes per book

The prints will have to be

proof read by one person

who will take ten

Total LT (minutes) = 205

Total PT (minutes)= 1230

Activity Ratio =

Total PT/Total LT 600%

Rolled %C&A =

52%

mins LT 10 mins

mins PT 60 mins

%C&A 100%

LT: 10

PT: 60

Skyworth Design Value Stream

A customer needs 6 books which will take 1230 hours to produce and deliver

* Total LT and PT are calculated by summing the LT and PT

values for all processes.

** Total %C&A is the Rolled %C&A, which is calculated by

multiplying the %C&A for all processes.

JK makes an order for two hundred units of books from Skyworth Design House. These Units are sibdivided into book 1, book 2, book 3, book 4, book 5 and book 6. Skyworth design house has 25 units in store and will therefore seek the processes of SDF supplier who is the prinitng house well as the graphic designer. Skyworth will review and update each of the books which will take approximately three hours to do so. these reviews have to be drafted and will consume six hours to do so. This will be followed by a supplier material requisition that will take six hours. Generally the whole process will take 1230 minutes which is approximately twenty one working hours. The client will get their order in the fourth day

the client needs the units as fast as possible

Receiving and Shipping

the books will be shipped

to the client