I need a assignment redone for my wk 9 for my Operational Excellence class
Name
Date
LT 30 mins LT 60 mins LT
PT 180 mins PT 360 mins PT
%C&A 90% %C&A 90% %C&A
LT: 30 LT: 60 LT:
PT: 180 PT: 360 PT:
Overview of the Process
Challenges
Bottlenecks
References
Martin, K. & Osterling, M. (2014). Value Stream Mapping.
Standard Work Instructions:
Vanessa Woodard
11/7/2022
Customer
1. Insert your name, title of the value stream, and
demand or Takt time.
2. Insert the activity, role, number of staff, LT, PT,
and %C&A in the process blocks. The summary
timeline should autopopulate.
3. Verify the current state summary metrics are
calculated correctly.
4. Add the current state overview, challenges, and
bottleneck. Include any other relevant metrics (i.e.,
NPS, AHT, etc.).
5. Review the assignment instructions once more.
Check your work. Upload and submit when ready.
Review & Update First Draft editing QC Supplier Material
JK makes an order for two hundred units of books from Skyworth Design House. These Units are sibdivided into book 1, book 2, book 3, book 4, book 5 and book 6. Skyworth design house has 25 units in store and will therefore seek the processes of SDF supplier who is the prinitng house well as the graphic designer. Skyworth will review and update each of the books which will take approximately three hours to do so. these reviews have to be drafted and will consume six hours to do so. This will be followed by a supplier material requisition that will take six hours. Generally the whole process will take 1230 minutes which is approximately twenty one working hours. The client will get their order in the fourth day
there may be issues in reviewing and getting the feedback to the print house
there are delays in the print house which may cause delays in the operations.
a minor error in one book may cause the design house to recheck all other components.
the client needs the units as fast as possible
Reviewing and updating
books needs two persons
and each books requires
First draft editing
requires two persons
each taking one hour for
Quanity supplied
material requires one
person who will consume
Title:
Demand or Takt time:
60 mins LT 30 mins LT 10 mins LT 5
360 mins PT 180 mins PT 60 mins PT 30
96% %C&A 70% %C&A 100% %C&A 95%
60 LT: 30 LT: 10 LT: 5
360 PT: 180 PT: 60 PT: 30
Skyworth Design Value Stream
A customer needs 6 books which will take 1230 hours to produce and deliver
Customer
Print ProofsQC Supplier Material Final Approval
Production Control
Proof Approval
the books have to be
apprived for printing
purposes. It will take one
JK makes an order for two hundred units of books from Skyworth Design House. These Units are sibdivided into book 1, book 2, book 3, book 4, book 5 and book 6. Skyworth design house has 25 units in store and will therefore seek the processes of SDF supplier who is the prinitng house well as the graphic designer. Skyworth will review and update each of the books which will take approximately three hours to do so. these reviews have to be drafted and will consume six hours to do so. This will be followed by a supplier material requisition that will take six hours. Generally the whole process will take 1230 minutes which is approximately twenty one working hours. The client will get their order in the fourth day
there may be issues in reviewing and getting the feedback to the print house
there are delays in the print house which may cause delays in the operations.
a minor error in one book may cause the design house to recheck all other components.
the client needs the units as fast as possible
Quanity supplied
material requires one
person who will consume
Final Approval is done by
one person and will take
thirty minutes per book
The prints will have to be
proof read by one person
who will take ten
Total LT (minutes) = 205
Total PT (minutes)= 1230
Activity Ratio =
Total PT/Total LT 600%
Rolled %C&A =
52%
mins LT 10 mins
mins PT 60 mins
%C&A 100%
LT: 10
PT: 60
Skyworth Design Value Stream
A customer needs 6 books which will take 1230 hours to produce and deliver
* Total LT and PT are calculated by summing the LT and PT
values for all processes.
** Total %C&A is the Rolled %C&A, which is calculated by
multiplying the %C&A for all processes.
JK makes an order for two hundred units of books from Skyworth Design House. These Units are sibdivided into book 1, book 2, book 3, book 4, book 5 and book 6. Skyworth design house has 25 units in store and will therefore seek the processes of SDF supplier who is the prinitng house well as the graphic designer. Skyworth will review and update each of the books which will take approximately three hours to do so. these reviews have to be drafted and will consume six hours to do so. This will be followed by a supplier material requisition that will take six hours. Generally the whole process will take 1230 minutes which is approximately twenty one working hours. The client will get their order in the fourth day
the client needs the units as fast as possible
Receiving and Shipping
the books will be shipped
to the client