1st Year Engineering drawing assignment. Need ASAP.
|
WEEK 7 |
LAB 5 Portfolio Activities. Review previous lab. Provide feedback on student work from previous lab. A3 (420 x 297) work starts. Three Measured Isometrics 3 exercises. Pg. 37, pg. 38 (use ordinates method for semi-circle) and left component on pg. 39 (Use compass approximation). Construction geometry must be shown on all solutions for non-isometric edges and curves. Measured Orthographic 1. Brake Mounting - 1st Angle Projection. Hidden detail can be omitted from the end views in this problem. Pg. 35 Working drawing principles for planning and building up views on a sheet. Students given border and title block on A3 landscape sheet for these problems. |
|
WEEK 8 |
LAB 6 Portfolio Activities. Review previous lab. Provide feedback on student work from previous lab. Measured Orthographic 2. Actuator Arm - 3rd Angle. Draw the elevation and plan only for this problem. Pg. 36 (Involves tangent circles in drawing the elevation). Auxiliary Views Two Exercises: Aux. Elevation pg. 42 Aux. Plan pg. 43 |
|
WEEK 9 |
LAB 7 Portfolio Activities. Review previous lab. Provide feedback on student work from previous lab. First Dimensioning Exercise pg. 40 (use of datum dimensioning) Second Dimensioning Exercise Pg. 41 Scale 1:2 |
|
WEEK 10 |
LAB 8 Portfolio Activities. Review previous lab. Provide feedback on student work from previous lab. Sectional Views. 1. Spindle Housing. Pg. 45 2. Junction Box. Pg. 46 |
|
WEEK 11 |
LAB 9 Portfolio Activities. Review previous lab. Provide feedback on student work from previous lab. Intersections and Developments. Pg. 56 Ex. 1 (Fabricated Multiway intersection and cylinder development) Pg. 56 Ex. 2 Ducting problem – angled square branch pipe; Students complete Part (a) only. |
|
WEEK 12 |
LAB 10 Portfolio Activities. Review previous lab. Provide feedback on student work from previous lab. Toleranced Dimensions-1 Exercise. (Using the Hole Basis system table; Data sheet BS4500A) pg. 53 engineer’s sketch exercise. Assembly drawing Simple Pulley Assembly incl. parts list. Bill of Materials (BOM). Pg. 55 |