Event Process Chain Diagram

samy071794
Assignment_01EventProcessChainDiagram.pdf

MITS5507 Assignment 1

MITS5507

Business Process Management

Event Process Chain Diagram

March 2019

MITS5507 Assignment 1

Copyright © 2015-2018 VIT, All Rights Reserved. 2

EPC Diagram (Individual Assignment) - 10% (Due week 5)

This assignment is to be completed Individually.

Objective(s)

EPC is an abbreviation for Event-driven Process Chain, and is a flowchart based diagram that can

be used for resource planning and identifying possible improvements of a business process.

Businesses use event-driven process chain diagrams to lay out business process workflows,

originally in conjunction with SAP R/3 modeling, but is now more widely used by many companies

for modeling, analyzing, and redesigning business processes. This will be a preliminary exercise

before utilizing BPMN 2.0 on the group Project in Assignment 3.

INSTRUCTIONS

In this assignment you will use Signavio, (see the Activity in week 3 for creating a Signavio

account) to prepare an EPC diagram for the Case Study below. Make sure to identify the

organizational units and actors relevant to the case study and indicate on the EPC diagram the

actor that is responsible for each task in the process.

Submission Guidelines

Your document should be a word or pdf document containing a copy of the EPC diagram you

constructed in Signavio. The EPC must only be ‘one page wide’, but it may span several

consecutive pages.

All submissions are to be submitted through the assignment 1 Drop-boxes that will be set up in

the Moodle account for this Unit of Study. Assignments not submitted through these drop-boxes

will not be considered.

Submissions must be made by the due date and time (which will be in the session detailed above)

and determined by your Unit coordinator. Submissions made after the due date and time will be

penalized at the rate of 10% per day (including weekend days).

Your EPC diagram will be checked for plagiarism, and plagiarized assignment will be penalized

heavily.

MITS5507 Assignment 1

Copyright © 2015-2018 VIT, All Rights Reserved. 3

Case Study

MouldPlast Ltd

MouldPlast is a plastics component subcontractor in the airline and automobile industry. They

specialise in products that must meet very high quality standards. The nature of their business

requires high standards of production where all processes and procedures are followed,

traceable, and auditable. These requirements are placed on them by their customers, and

failure to meet them would be a serious impediment to their business.

You have been called in to document and improve their pre-production procedures. This

includes receiving and storage of materials used in manufacturing.

When materials first arrive, the receiving clerk confirms the shipment by comparing the

shipment to the Purchase orders on file. In most cases, materials can be matched with Purchase

orders. On the occasion that they cannot be matched, the relevant Purchasing Officer is

urgently notified of the materials to confirm that the materials have not been ordered as in

some instances, suppliers substitute alternatives for an order. In the case that the materials

have not been ordered, the materials are refused.

The receiving clerk then sorts the materials into two categories; perishable and non-perishable

and assigns a material number. The materials are then placed in one of the quarantine areas

that are appropriate for the type of materials. A ‘Materials in Quarantine’ notice is sent to

Quality Control for all materials. In the case of perishable materials, a copy is also sent to the

Materials Lab. This note lists the name of the material, its location, the quantity, and material

number.

On receiving the ‘Materials in Quarantine’ notice, Quality Control inspects the materials and

determines their suitability and assigns a material number. In some instances, they need to

have tests run by the Materials Lab to determine the suitability of the materials, so a Lab

Inspection Request is sent to the Materials Lab. The Lab returns an ‘Inspection Report’ to

Quality Control commenting on the suitability of the materials. The ‘Lab Inspection Request’

notes the tests that need to be performed on the materials.

If the materials fail to meet the required standards, Receiving, Production and Purchasing are

advised with an ‘Unsuitable Materials’ notice. Receiving attaches a ‘Reject Notice’ on the

materials and moves them to a reject area for disposal and advises Purchasing of the rejected

materials. Purchasing is responsible for determining the procedures for disposal of the material

(this may involve returning the materials to the supplier or destruction of them). If Quality

MITS5507 Assignment 1

Copyright © 2015-2018 VIT, All Rights Reserved. 4

Control accepts the materials, a ‘Quarantine Release’ note is sent to Receiving. On receiving this

note, the goods are moved from the quarantine area to the goods received area. For non-

perishable materials, Stores Supervisor is sent a ‘Materials for Storage Advice’.

On receiving this note, a storeman collects the goods and stores them in the appropriate area.

In the case of perishable materials, the Materials Lab is advised that the materials are ready for

analysis. The Materials Lab then takes a sample and prepares ‘Cooking and Storage Report’

which is sent to Production Planning and a copy is also forwarded to Receiving. At this point,

Receiving sends the ‘Materials for Storage Advice’ for these materials to the Store. The

attached ‘Cooking and Storage Report’ is used to determine the location for storage. (Several

different storage areas are used, some have carefully controlled temperature, humidity or

both).