Civil Engineering Materials Short Lab

Mohdqahtani7
AggLabDataSheet.pdf

CEE 2011 - Aggregate Laboratory Data Sheet Name: Lab:

Group:

Aggregate Sieve Analysis Record the weight to the nearest 0.01 gram.

initial mass of aggregate sample: g

Mass of

Sieve

Mass of

Sieve +

Sample

Mass of Sample

retained on the

sieve

(a)

Cumulative

amount of the

retained

(b)

percent

passing

d=100 - c

(g) (g) (g) (g) %

3/4' 19mm 99

1/2' 12.5mm 87

3/8' 9.5mm 67

#4 4.75mm 50

#8 or 10 2.36mm 42

#30 0.60mm 33

#50 0.30mm 15

#100 0.15mm 10

#200 0.075mm 5

Pan

Sieve

%

final Total mass of

sample:

percent difference (< 0.3%):

Cumulative percent

of the retained

c=b*100/Total

0

20

40

60

80

100

0.01 0.1 1 10 100

P e

rc e

n t

P a

ss in

g (

% )

Size (mm)