Civil Engineering Materials Short Lab
CEE 2011 - Aggregate Laboratory Data Sheet Name: Lab:
Group:
Aggregate Sieve Analysis Record the weight to the nearest 0.01 gram.
initial mass of aggregate sample: g
Mass of
Sieve
Mass of
Sieve +
Sample
Mass of Sample
retained on the
sieve
(a)
Cumulative
amount of the
retained
(b)
percent
passing
d=100 - c
(g) (g) (g) (g) %
3/4' 19mm 99
1/2' 12.5mm 87
3/8' 9.5mm 67
#4 4.75mm 50
#8 or 10 2.36mm 42
#30 0.60mm 33
#50 0.30mm 15
#100 0.15mm 10
#200 0.075mm 5
Pan
Sieve
%
final Total mass of
sample:
percent difference (< 0.3%):
Cumulative percent
of the retained
c=b*100/Total
0
20
40
60
80
100
0.01 0.1 1 10 100
P e
rc e
n t
P a
ss in
g (
% )
Size (mm)