Product developement

hahhah
5.pptx

Product life cycle

Develop phase

Design, create and test the product

Ensures that product functions as planned

Example

Converting 4G cellphone networks to 5G

Transforming a traditional library into an e-library to facilitate faster searching and accessibility of electronic books and other digital documents

Next generation iphone 11

Other examples?

Product life cycle

7 distinct steps

Develop

Requires you to be disciplined and technical

Product life cycle

7 distinct steps

Develop

Project initiation

Project planning

Project execution

Project control

Project closing

Results in successful delivery of product

Key considerations during Develop Stage

Product development involves risk of investing precious time, money (capital) and intellectual resources. Therefore, it is necessary that it is well-planned

Product development also involves change introduced due to new opportunities and shifts in the market conditions. Hence, it is necessary to have a robust change management system

Applying project management to product development

During this stage, the following activities may be performed

Prototyping

Rough layouts

Mechanical design

Engineering design

Planning for manufacturing product components

Product assembly and testing

Standards compliance

Cost optimizations

Quality reviews

Publishing product documents

Contingency planning

Apply the 5 step project management to manage each of these activities

Application Exercise: Applying project management to product development

You are product owner for new product of Coke ™ codenamed Coke “XP”. The product is in engineering design phase of development

As a product owner what would you do?

New product

Coke “XP”

Project management stage Tasks Specific actions
1 Initiation Review business case Develop goals, charter Kick off Get the requirements 1st sample of Coke”XP” complete by April, 2017 Communicate plans to team
2 Planning Statement of work Conduct HOQ Implement change management system
3 Execution Acquire resources Hire/train the team, get the tools Develop prototype and test
4 Control Keep schedule on track Manage expectations Conduct engineering reviews Communicate status, issues, changes
5 Closing Post-review Reward/recognize Document key learnings “Paid vacation” to team

Key take-aways

Which of these product development processes accurately describes the sequence of events in developing a new product?

A. Product ramp up, reflection and results, testing and refinement, system level design, detail design, concept generation, planning

B. Detail design, system level design, product ramp up, concept generation, product planning

C. Concept generation, product planning, detail design, testing, reflection and results

Key Take-aways

True or False?

Development stage :

Design, create and test the product

Ensures that product functions as planned

Which is true of the team developing the product?

A. They should ask questions that foster experimental activity

B. They should modify the existing product without prototyping

C. They should reflect on the process and then benchmark it

Product development involves ____ and ____ therefore, it is necessary that it is well-planned and that it should have a robust ______ _______ ______.

Next topic:

Management practices

Questions?

Key take-aways (Answers)

Which of these product development processes accurately describes the sequence of events in developing a new product?

A. Product ramp up, Reflection and results, testing and refinement, system level design, detail design, concept generation, planning

B. Detail design, system level design, product ramp up, concept generation, product planning

C. Concept generation, product planning, detail design, testing, reflection and results

Answer: C

Key Take-aways

True or False?

Development stage :

Design, create and test the product (true)

Ensures that product functions as planned (true)

Which is true of the team developing the product?

A. They should ask questions that foster experimental activity (true)

B. They should modify the existing product without prototyping (false)

C. They should reflect on the process and then benchmark it (true)

Product development involves risk and change therefore, it is necessary that it is well-planned and that it should have a robust change management system.