Recap- Guide/Requirements for Appendices

Dr. Andre Samuel

Appendix A- Risk Register

Risk Register- see template on VLE

# RMP No.

S ta

tu s

R is

k C

a te

g o

r y

Risk Event Cause/Trigger Effect

T h

r e a t

o r

O p

p o

r tu

n it

y

Primary Objective

Probability Impact Response Strategy

Response Actions Responsibile

Entity Interval or

Milestone Check Status: Date and

Review Comments

VH

H X

M

L

VL

VL L M H VH

VH

H

M X

L

VL

VL L M H VH

VH

H

M

L X

VL

VL L M H VH

VH

H

M X

L

VL

VL L M H VH

Sample Risk Management Register for Project XXXX

Project delayed Budget Constraints- allocation in doubt or subject to change

Project not fully funded

E x te

rn a l

A c ti v e

1 Project may be divided into 2or

3 phases with options in the contract

Monitoring and Control

Project cost increases

T h

re a t

Cost Low Low P

r o

b a

b il it y

Progam Engineer

Impact

P r o

b a

b il it y

T h

re a t

Permit delays

E x te

rn a l

Permits expire. Permits or agency actions are delayed or

take longer then expected.

Impact

3

A c ti v e

Unidentified utility impacts

C o n s tr

u c ti o n

Unidentified utilities

4

A c ti v e

xx/xx/2008

Impact

Transfer Consultant reponsible for coordinating permits and

identifying permit requirements.

Environmental Engineer

Monthly Fines, penalties and project

delays

T h

re a

t

Time Medium Low

P r o

b a b

il it

y

Mitigate Increased unit price for

excavation to match rock excavation price

Geotechnical Manager

At completion of subsurface exploration

Transfer Contingency plan. Contractor is

responsible for coordination. Utility Engineer Monthly xx/xx/2008

Risk Identification Qualitative Risk Assessment

xx/xx/2008

Impact

Cost Medium Medium

P r o

b a

b il it

y

2

A c ti v e

Inaccurate cost estimate

D e

s ig

n

HighTime Very High

Unit pricing effected by rock excavation and disposal site

issues EE is underestimated

T h

re a t

Risk Response Plan

Monthly xx/xx/2008Mitigate

Risk Matrix

Appendix B- Gantt Chart

Steps to Build Gantt Chart

•1. Complete dependency table with: • Id • Task name • Duration • Predecessor

• Use Local Bus Project Plan Warm Up document in Dropbox.

•2. Document your Assumptions: • Holidays • Start date • etc

•3. Open Project Libre • Click Create Project • Enter Project Name • Enter Project Start Date

• To set milestones: • Create a milestone task name • Set Duration to ‘0’ days

•4. Enter Task name, Duration and Predecessor into rows

•5. Add holidays • On FILE go to CALENDAR • Select dates • Set to NON-WORKING TIME • Repeat for all holidays

•6. Add Project Summary Task • Insert New Task above task 1

• Right click on ID 1 • Choose New • Type in Name of Project

• Select all Task below • On TASK click INDENT

•7. Add Total Slack Column • Right Click on Duration Column heading • Choose Insert Column • On Dialog box, choose Total Slack

•8. Add Resources • Go to RESOURCES click Resources Button • Type in resource names • Use separate rows for each resource

•9. Assign Resources to Tasks • Go back to Gantt Chart view

• TASK click Gantt

• Double click first task • Go to Resources Tab • Click Assign Button • Select resource • Click Assign

• Repeat for each Task

•10. Add Cost Elements • Go to Resources • Add Cost Elements as Resources • Double Click each Cost Element • On General Tab,

• Change Type to Material

• On Cost Tab, • Enter Cost per use

•11. Add Cost to Gantt Chart • Go back to Gantt Chart view • Enter in new Row:

• Name- the Cost Elements • Duration- ‘0’

• For Each Cost Element: • Double click • Go to Resource tab • Assign the Cost Element

• 12. Insert COST Column

•13. Screen Shot for Appendix • Before:

• Check that all the columns are visible • Task, Cost, Total Slack, Duration, Start, Finish, Predecessor, Resources

• Check that all bars are visible • On TASK • Click Zoom Out

• Once, OK • Use either Snipping Tool OR Prt Sc button on Keyboard • Paste into Final Report Appendix B

Appendix C- Stakeholder Matrix

Power/Interest Matrix with Stakeholders

A-H representing the placement of generic stakeholders

PMI (2013)

Appendix D- Project Charter