Week 4 Structured Assignment - Preventative Controls

rohithhwm

Create Preventative Controls for SunGrafix, a video game design company. In some cases, the outage impacts identified in the BIA may be mitigated or eliminated through preventive measures that deter, detect, and/or reduce impacts to the system. Where feasible and cost effective, preventive methods are preferable to actions that may be necessary to recover the system after a disruption. Preventative controls include the identification of effective contingency planning preventive controls and maintaining these controls on an ongoing basis. Identify and incorporate a variety of preventive controls into your BCP. Some of the listed controls are the following:

  • Appropriately sized uninterruptible power supplies (UPS) to provide short-term backup power to all system components (including environmental and safety controls);
  • Gasoline- or diesel-powered generators to provide long-term backup power;
  • Air-conditioning systems with adequate excess capacity to prevent failure of certain components, such as a compressor;
  • Fire suppression systems;
  • Fire and smoke detectors;
  • Water sensors in the computer room ceiling and floor;
  • Heat-resistant and waterproof containers for backup media and vital non electronic records;
  • Emergency master system shutdown switch;
  • Offsite storage of backup media, non-electronic records, and system documentation;
  • Technical security controls, such as cryptographic key management; and
  • Frequent scheduled backups including where the backups are stored (onsite or offsite) and how often they are recirculated and moved to storage.

MAKE THIS ASSIGNMENT FOR TREE DIFFERENT PEOPLE IN 3 WAYS WITHOUT PLAGIARISM.I NEED 3 ATTACHMENTS AS ANSWER

    • 10 years ago
    • 60
    Answer(1)

    Purchase the answer to view it

    NOT RATED
    • order_19796_week_4_structured_assignment__2.doc
    • order_19795_week_4_structured_assignment__1.doc
    • order_19797_week_4_structured_assignment__3.doc