VoIP Part 1 (Work Breakdown Structure)
This assignment contains two (2) deliverables: a summary document to be delivered in a word processor document format and a Work Breakdown Structure (WBS) to be delivered in a project file.
Overview
As the project manager for an IT department, you have been assigned to manage the project of deploying a new VoIP phone system to the company’s campus. The campus consists of three (3) different buildings, each with twenty to fifty (20 to 50) workstations. The project must be completed in ninety (90) calendar days starting on November 1.
Deliverable 1: Summary (MS Word or open source equivalent)
1. Write a one to two (1-2) page summary document in which you:
a. Summarize the project requirements and other assumptions (e.g., budget, human resources, workload, environmental dependencies, etc.).
b. Define a work breakdown structure and describe the methodology behind constructing one.
Deliverable 2: WBS (MS Project or open source equivalent)
2. Use Microsoft Project to create a WBS which:
a. Contains at least five (5) main tasks, one for each of the PMBOK® process areas.
b. Contains at least sixty (60) line items distributed in ten (10) or more work packages.
c. Contains Work Breakdown Structure Code for each task.
d. Presents a duration estimate for each task which results in a duration estimate for the project not to exceed the requirements described in the overview.
Deliverable one (1) of your assignment must follow these formatting requirements:
- Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
- Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
11 years ago 40
Purchase the answer to view it
- cis_517_assignment_3_voip_part_1_work_breakdown_structure_viop_implementation_requirements_1.doc
- cis_517_it_project_wbs_1431313934_0.pdf
Purchase the answer to view it
- deliverable_1_summary.docx
- deliverable_2_wbs.mpp
Purchase the answer to view it
- work_breakdown_structure_part1.doc
Purchase the answer to view it
- cis_517_week_5_assignment_3_voip_part_1_work_breakdown_structure.docx
- voip_impl_project_plan.mpp
Purchase the answer to view it
- deploying_a_voip_system.docx
- solution_mpp.mpp
- rephrase
- Conflicting Viewpoints new paper.
- Buisness FIN 330-week 5
- chemistry programming
- OMM 615 Week 5 Assignment ( Social Media ) ~ ( Latest Syllabus - Perfect Tutorial - Scored 100% )
- i need help
- BUS 680 Week 3 DQ 2 Classroom-based Learning Experience
- Personnel and Organization Policy IP 2
- MKT 571 Final Exam
- FIN 534 Week 8 Homework Problems Chapters 14 and 15