Statistics | Minitab
The below data is for questions 1-3 problems below
26.7 | 24 | 25.8 | 29.2 | 28.6 |
23.1 | 27.7 | 26.6 | 28.9 | 30.7 |
29 | 27.2 | 24.6 | 28.5 | 27.8 |
28 | 24 | 30.9 | 31.7 | 24.2 |
23.1 | 29.8 | 30.3 | 22.2 | 27.1 |
1) What proportion of the population do we expect to fall outside the specifications if the specifications are LSL=20 and USL=32? (assume a Normal distribution and use the standard normal table)
2) We wish to test if there is sufficient evidence at the 95% confidence level that the process may be off the target of 26 in H2O. What is the appropriate Null Hypothesis?
3) From the data collected, is there sufficient evidence at the 95% confidence level that the process may be off the target of 26 in H2O? (i.e. Is the process mean significantly different from 26?)
4) A production process is operating at 5% nonconforming. If we select 20 pieces at random from the production process, what is the probability that more than 2 of the 20 are nonconforming.
Note: ensure probabilities are between 0 ≤ p ≤ 1
5) The billing department of a major credit card company tracks the number of errors on customer’s bills. Suppose that errors occur according to a Poisson distribution with parameter l=.07. What is the probability that a customer’s bill selected at random contains at least one error?
Note: ensure probabilities are between 0 ≤ p ≤ 1
6) A chemical manufacturing process is monitored by X-bar and S charts. Twenty five subgroups of size 4 are collected to establish the control limits.
X-bar-bar =200
S-bar = 4.5
A. Calculate the control limits for both charts.
Ai) What is the LCL for the X-bar chart?
7) A chemical manufacturing process is monitored by X-bar and S charts. Twenty five subgroups of size 4 are collected to establish the control limits.
X-bar-bar =200
S-bar = 4.5
A. Calculate the control limits for both charts.
Aii) What is the UCL for the S chart?
8) A chemical manufacturing process is monitored by X-bar and S charts. Twenty five subgroups of size 4 are collected to establish the control limits.
X-bar-bar =200
S-bar = 4.5
B. Estimate the process standard deviation
9) Six Sigma methodology allows for process shifts of up to a 1.5 sigma from batch to batch. If the process is being monitored by X-bar and R charts with a subgroup size n=4 and shifts 1.5 sigma, what would be the ARL of the X-bar chart? (ie how long will it take us on average to detect a shift of that magnitude)
11 years ago 30
Purchase the answer to view it
- stats.xlsx
- subbu
- Philosophy of Love and Sex Final Paper
- The minimum length for this assignment is 1,500 words. Be sure to check your Turnitin report for your post and to make corrections before the deadline of 11:59 pm Mountain Time of the due date to avoid lack of originality problems in your work. The maint
- 1-Hour Writer
- Conducting a Job Search
- BSHS 415 Week Fifteen: Completing Your Internship
- finance
- 109
- Calculate the monthly mortgage payment of principal and interest for the a loan with an initial balance of 150,000, an...
- You are an analyst for the Vanguard Mortgage Company has been using a spreadsheet created by you in the past which functions well. The current worksheet you created currently contains the customer’s account, the cost of the house, down payment, amount fin