piipip51
- Save the PowerPoint presentation section called "Procedures Manual Training."
- Update the procedures manual title page with the new date and the project name.
- Update previously completed sections based on instructor feedback.
- Be sure to update your table of contents before submission.
- Name the document "yourname_ITDI373_IP5.doc."
- Submit the final procedures manual document for grading.
- Deliverables:
The overall project deliverables are:
Procedures manual document shell (in MS Word format)
- Title Page
- Course number and name
- Project name
- Your name
- Date
- Table of contents (autogenerated)
- This should be on a separate page
- This should be a maximum of 3 levels deep
- Fields should updated so that the TOC it is up-to-date before submitting your project
- Section headings
- Project Outline
- Abstract
- Procedures Manual Outline
- Procedures Manual Proposal
- Procedures Manual Brochure
- Procedures Manual Preparation Plan
- Procedures Manual
- Procedures Manual: Quick Reference
- Procedures Manual Training (PowerPoint Deck)
11 years ago 20
Answer(1)
Purchase the answer to view it
NOT RATED
- piipip51.rtf
Bids(1)