p chart
Assignment:
You will complete a p chart similar to the example shown in Chapter 9, section 9.2, figure 9.1 & 9.2, from our textbook “Statistical Process Control and quality Improvement”, starting from the provided Excel template
Formatting:
Calculations: On merged cells, use only the left side for use in formulas. If your formulas span two columns, you may add some numbers twice.
Text Size: All of the text in this assignment has been preset to the individual cells.
Margins: The margins have been preset in this assignment. If you file does not display correctly, you will need to change the page setup. The top, bottom, and right side are set for ¼’ (0.25) margins. The left margin is set to ½” (0.5”). The view is set to normal; the page is set to US Legal, landscape, and fit to page.
Name Block: Place the name block in the upper left corner of the page, in cells A1 through A3. Put yourname first, then the class title and then the due date, as per the example:
Your Name
TECH 458 Quality Assurance
Saving/Naming Your File:
When you save your file make sure that your name and the project number are included in it.
Example: YourName458Asgnmt2
10 years ago 5
Purchase the answer to view it
- the_p-chart.xlsx
- assn6
- Recognizing the Impact of Diversity on the Workplace ( 7–10-slidePower Point- APA standards to citation of sources
- Thank you in advance
- paper 700-1000 words
- Creative Essay
- 20 page research paper on buddhist philosophy. Masters level!!
- Can you do review assignment due 1/9/16 @ 7:30 pm eastern time 2-3 pages
- MATH540
- Communicating Quality Data
- MKT3010 Week 3 Assignment 2: Final Project Part 1 - Scenario 2