Freight car loadings over an 18-week period at a busy port are as follows:

    

WeekNumberWeekNumberWeekNumber
1250729513410
2260832514415
3270935515435
42601034516445
52701137517455
62751240518465

   
 

a.

Determine a linear trend line for expected freight car loadings. (Round your intermediate calculations and final answers to 2 decimal places.)

   
 

    = [removed] + [removed] t

     
 

b.

Use the above trend equation to predict expected loadings for Weeks 20 & 21. (Round your final answers to 2 decimal places.)

   
 

 The forecasted demand for Week 20 is [removed] and for Week 21 is [removed] .

    
 

c.

The manager intends to install new equipment when the volume exceeds 830 loadings per week. Assuming the current trend continues, in which week (at the earliest) should the loading volume reach that level?  (Use the rounded answers, as required, from any previous part of this problem.  Do not round any other intermediate calculations.  Round your final answer to 2 decimal places.)

    
 

  It should reach 830 loadings in Week [removed] .

 

Answer the questions above