OPERATION MANAGEMENT QUIZ : 30 M/C QUESTIONS :
QUESTIONS :
1
Which of the following is considered a major process flow structure?
- pastedGraphic.pdf
Fabrication
- pastedGraphic_1.pdf
Lean Manufacturing
- pastedGraphic_2.pdf
Project
- pastedGraphic_3.pdf
Lead Time
2
Which of the following is considered an organizational blueprint, which prescribes the quantity and time frame for when each end product will be assembled?
- pastedGraphic_4.pdf
WBS (Work Breakdown Structure)
- pastedGraphic_5.pdf
MPS (Master Production Schedule)
- pastedGraphic_6.pdf
MRP (Material Requirements Plan)
- pastedGraphic_7.pdf
ERP (Enterprise Resource Planning)
3
There are many applications of poka-yokes in service organizations. Which of the following is one of the three-T's used to classify poka-yokes?
- pastedGraphic.pdf
Trust
- pastedGraphic_8.pdf
Task
- pastedGraphic_9.pdf
Time
- pastedGraphic_10.pdf
Teamwork
4
Which of the following is ISO 14000 primarily concerned with?
- pastedGraphic_4.pdf
Environmental management
- pastedGraphic_5.pdf
Quality management
- pastedGraphic_11.pdf
Continuous improvement management
- pastedGraphic_5.pdf
Time management
5
Deming’s PDCA (plan, do, check, and act) cycle underlies what inherent Six Sigma principle?
- pastedGraphic_6.pdf
Standard deviation
- pastedGraphic_12.pdf
Control charting
- pastedGraphic_4.pdf
Project management
- pastedGraphic_13.pdf
Continuous improvement
6
Which of the following is one of Dr. Eli Goldratt's rules of production scheduling for optimized production technology?
- pastedGraphic_5.pdf
Utilization and activation of a resource are not the same.
- pastedGraphic_14.pdf
An hour saved at a bottleneck operation does not increase the process flow.
- pastedGraphic_5.pdf
Do not allow bottlenecks to govern the flow of the line.
- pastedGraphic_10.pdf
If you lose an hour at a bottleneck it is better than making scrap.
7
A project manager must consider several components when overseeing the planning process of aggregate operations; specifically, whether such components are factors that are internal or external to the organization. Which of the following factors would be classified as an internal component for an organization?
- pastedGraphic_15.pdf
Inventory levels and economic conditions
- pastedGraphic_16.pdf
Market demand and subcontractor capacity
- pastedGraphic_17.pdf
Competitor behavior and current workforce
- pastedGraphic_4.pdf
Current physical capacity and current workforce
8
A project can be segmented into which of the following?
- pastedGraphic_17.pdf
Events
- pastedGraphic_5.pdf
Sub-jobs
- pastedGraphic_6.pdf
Work packages
- pastedGraphic_18.pdf
Success markers
9
In most cases, demand for products or services can be broken into several components. Which of the following is considered a component of demand?
- pastedGraphic_19.pdf
Past elements
- pastedGraphic_12.pdf
Level elements
- pastedGraphic_20.pdf
Cyclical elements
- pastedGraphic_21.pdf
Future elements
10
Which of the following is one of the principles of reengineering?
- pastedGraphic_22.pdf
Leverage high cost employees with lower cost employees.
- pastedGraphic_23.pdf
Have those who use the output of a process perform the process.
- pastedGraphic_24.pdf
Do not select suppliers on the basis of price alone.
- pastedGraphic_25.pdf
Quality at the source
11
Which production process term best describes the situation when activities in a stage of production must stop because there is no work?
- pastedGraphic_26.pdf
Starving
- pastedGraphic_27.pdf
Buffering
- pastedGraphic_28.pdf
Blocking
- pastedGraphic_26.pdf
Staging
12
Considering Hau Lee’s uncertainty framework for classifying supply chains, which of the following is given to a supply chain which has an evolving supply process based on functional products?
- pastedGraphic_29.pdf
Forward looking
- pastedGraphic_30.pdf
Efficient
- pastedGraphic_5.pdf
Agile
- pastedGraphic_4.pdf
Risk hedging
13
What is the starting point in developing a capacity plan for a health care operation?
- pastedGraphic_31.pdf
Forecasting patient demand for a reasonable length of time
- pastedGraphic_32.pdf
Estimating design capacity
- pastedGraphic_33.pdf
Discovery of the bottleneck operation
- pastedGraphic_34.pdf
Determining the effective capacity over time
14
The Shingo system states that the way to prevent defects from coming out at the end of a process is to do which of the following:
- pastedGraphic_35.pdf
Slow down production rates until the process is in control.
- pastedGraphic_36.pdf
Introduce controls within the process.
- pastedGraphic_37.pdf
Redesign the process in order to mitigate the bottlenecks.
- pastedGraphic_38.pdf
Utilize SQC (statistical quality control).
15
Which is the one correct value stream principle?
- pastedGraphic_39.pdf
Look for efficiencies in the factory, office, physical, procedural, and technical operations.
- pastedGraphic_40.pdf
Eliminate waste that stops, slows down, or diverts the value stream.
- pastedGraphic_38.pdf
Keep the value stream moving at minimum velocity.
- pastedGraphic_41.pdf
Concentrate on speeding up value-adding operations rather than removing waste.
16
According to the theory of constraints, which of the following financial measurements can be used to measure the firm's ability to make money?
- pastedGraphic_42.pdf
Return on investment
- pastedGraphic_38.pdf
Dividends
- pastedGraphic_43.pdf
Operating expenses
- pastedGraphic_42.pdf
Sales
17
Design for manufacturing and assembly delivers product improvements by emphasizing which of the following:
- pastedGraphic_44.pdf
Reducing equipment in the production process
- pastedGraphic_45.pdf
Designing products so they can be manufactured by a virtual factory
- pastedGraphic_46.pdf
Simplification of the product by reducing the number of separate parts
- pastedGraphic_47.pdf
Reducing product quality during the assembly process
18
Which of the following is an analytical tool used in Six-Sigma quality improvement programs?
- pastedGraphic_48.pdf
Tree charts
- pastedGraphic_49.pdf
Gantt charts
- pastedGraphic_45.pdf
Pedigree charts
- pastedGraphic_31.pdf
Pareto charts
19
Which of the following is an element that addresses elimination of waste under lean production?
- pastedGraphic_50.pdf
Production ahead of demand
- pastedGraphic_51.pdf
Kanban production control system
- pastedGraphic_50.pdf
Group plant loading technology
- pastedGraphic_42.pdf
Minimized run times
20
Which of the following is usually included as an inventory holding cost?
- pastedGraphic_52.pdf
Quantity discounts
- pastedGraphic_42.pdf
Typing up an order
- pastedGraphic_47.pdf
Breakage
- pastedGraphic_53.pdf
Order placing
21
According to the theory of constraints, which of the following can be a capacity-constrained resource (CCR)?
- pastedGraphic_42.pdf
An employee
- pastedGraphic_42.pdf
Inoperable equipment
- pastedGraphic_54.pdf
A customer
- pastedGraphic_52.pdf
Product design
22
ISO audits result in certifications that are done by first, second, or third parties. Which of the following result in the best certification of a firm?
- pastedGraphic_55.pdf
1st Party – where a firm audits itself against ISO standards
- pastedGraphic_53.pdf
2nd Party – where a customer audits its supplier
- pastedGraphic_56.pdf
Certification is sought by any firm assuming they pay annual dues.
- pastedGraphic_57.pdf
3rd Party – where a qualified national or international standards/certifying agency serves as an auditor
23
During the implementation of a project, which of the following should be the primary focus of a consulting firm?
- pastedGraphic_42.pdf
People management skills
- pastedGraphic_58.pdf
Application of the learning curve theory
- pastedGraphic_59.pdf
The correct project software
- pastedGraphic_60.pdf
Tools and materials availability
24
In a Gantt chart the vertical axis represents which of the following?
- pastedGraphic_61.pdf
Cost
- pastedGraphic_53.pdf
Revenue
- pastedGraphic_37.pdf
Tasks
- pastedGraphic_60.pdf
Time
25
Which of the following is a cost impact and payoff analysis tool from the operations consulting tool kit?
- pastedGraphic_45.pdf
Gap analysis
- pastedGraphic_42.pdf
Work sampling
- pastedGraphic_43.pdf
Decision trees
- pastedGraphic_33.pdf
Statistical tools
26
The ability to rapidly and inexpensively switch production from one product to another enables which of the following:
- pastedGraphic_62.pdf
Economies of shape
- pastedGraphic_37.pdf
Economies of size
- pastedGraphic_58.pdf
Economies of scope
- pastedGraphic_63.pdf
Economies of scale
27
Which of the following is a major factor that distinguishes service design and development from manufacturing design and development?
- pastedGraphic_33.pdf
The service package is the major output of the development process.
- pastedGraphic_50.pdf
The service package has the same legal protection available to manufactured goods.
- pastedGraphic_64.pdf
The service process and service product can be developed independently.
- pastedGraphic_65.pdf
Manufacturing is far more capital intensive than services.
28
Which of the following is a characteristic that can be used to guide the design of service systems?
- pastedGraphic_33.pdf
Services cannot be inventoried.
- pastedGraphic_47.pdf
Services businesses are inherently entrepreneurial.
- pastedGraphic_37.pdf
Quality work means quality service.
- pastedGraphic_42.pdf
Services are all similar.
29
Which of the following is the net requirement using an MRP program if the gross requirement is 10,000 and the inventory on hand is 4,000?
- pastedGraphic_45.pdf
4,000
- pastedGraphic_37.pdf
10,000
- pastedGraphic_58.pdf
14,000
- pastedGraphic_33.pdf
6,000
30
Which of the following terms describes the time a unit spends actually being worked on together with the time spent waiting in a queue?
- pastedGraphic_45.pdf
Build time
- pastedGraphic_66.pdf
Flow time
- pastedGraphic_42.pdf
Run time
- pastedGraphic_33.pdf
Cycle time
13 years ago