jia-heper

elainejohnson19

SPREAD SHEET

TaskStart DateDurationEnd Date                     Cost Estimations  
Earth excavation8/1/201428/3/2014  elementsunitsper unit costTotal 
laying cement concrete in foundation8/4/201468/10/2014  labor20$80 $1,600  
placement of steel bar net8/11/201438/14/2014  cement350$50 $17,500  
laying cement concrete 8/15/201418/16/2014  steel metal100$70 $7,000  
work curing and earth refilling 8/17/201428/19/2014  concrete9$20 $180  
tying rings around vertical steels8/20/201448/24/2014  supervision4$120 $480  
fixing form work8/25/201428/27/2014  TOTAL  $26,760  
laying cement concrete8/28/201449/1/2014       
curing RCC column9/2/201429/4/2014

 

 

 

      

ORIGINAL ASSIGNMENT

 

Use Microsoft Excel to create a cost estimate for the concrete and structural framing portions of a building project of your choosing. Select the location, size, and type of project. All necessary material, equipment, and labor costs are to be included.

Next, use Excel to create a schedule for the project from start to finish. The schedule will focus on activity sequence, duration, and the critical path.

Accompany the estimate and schedule with a paper summarizing calculations and detailing how activity durations and critical path were derived. Also discuss local constraints, building codes, and OSHA requirements affecting the project.

Support your work with references to the online course material, text, personal experience, and other outside sources if necessary. Properly cite all sources using the APA format.

          

 