ip3 need done TODAY

tmiinc

For this assignment, you will develop a plan for at least 3 types of tests, and describe the quality controls that you plan to perform quality assurance.

The project deliverables are as follows:

  • Update the System Requirements, Design, and Implementation Specification title page with the new date.
  • Update the previously completed sections based on the instructor's feedback.
  • Test and Quality Assurance Plan
    • Develop a plan for unit testing. Include specific application functions that will be tested and how the tests will be conducted.
    • Develop a plan for system testing. Include areas that you will test within both the application and a system as a whole and how errors will be tracked and reported.
    • Develop a plan for user acceptance testing. Include key stakeholders who should perform the test and how they will record any issues that they find.
    • Develop a quality assurance plan. Include specific quality assurance methods or control, what their purpose is, and in which phase they will be utilized. 
  • Name the document "yourname_IT425_IP3.doc."